1 / 7

Setup Reduction For CNC Machining & Turning Centers

Copyright 2001. Setup Reduction For CNC Machining & Turning Centers. Demo only – Most topics are not active!. Copyright 2001. Setup Reduction For CNC Machining & Turning Centers. Demo only – Most topics are not active!. Setup Reduction For CNC. Setup reduction techniques:. Preliminaries:.

emmly
Download Presentation

Setup Reduction For CNC Machining & Turning Centers

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Copyright 2001 Setup Reduction For CNC Machining & Turning Centers Demo only – Most topics are not active!

  2. Copyright 2001 Setup Reduction For CNC Machining & Turning Centers Demo only – Most topics are not active!

  3. Setup Reduction For CNC Setup reduction techniques: Preliminaries: • Basic premises (20:00) • Introduction (04:00) • Importance of setup reduction (04:00) • Preparation and organization (17:00) • Workholding setup (mc-15:00, tc-21:00) • Justification issues (05:00) • Cutting tools (mc-22:00, tc-14:00) • What do you want to reduce? (02:00) • Program zero assignment (m-16:00 t-06:00) • Intro. to parametric programming (05:00) • Program development (07:00) Setup reduction principles: • Program transfer and storage (05:00) • Setup time defined 06:00 • Program verification (25:00) • Two tasks related to setup (2:00) • Program optimizing (07:00) • Three ways to reduce setup time (05:00) • Other tasks related to setup (02:00) • Four steps to setup reduction (17:00) Quick Index Of Techniques Demo only – Topics in gray are not active! 3 hours, 47 minutes of presentation! Exit Click on a topic!

  4. Quick Index Of Techniques Preparation & organization Cutting tools (MC) Program development • Spot disorganization • Well designed work area • Improving personnel utilization • Documentation issues • Programming versus setup time • Job order planning • Kitting • Non-production time • Standard tool stations • Consolidate cutting tools • Removing/replacing tools • Assemble tools off line • 2 ways to use length comp • Measuring off line • Multiple identical tools • Presetting certain tools • Program for setting offsets • Tool length measuring probes • Program to measure lengths • Taper reamers • Part families Program transfer • PC based controls • Background edit • Manual DNC system • Automatic DNC system Program verification • Two-part definition • Proven jobs • Tool path plotters • Off line verification • Trial machining • Presetting tools • Programming trial machining • Trial boring • Trial turning • Changing machining order Workholding setup (MC) • Multi workholding devices • Qualified setups • Making use of sub-plates • Changing parameters • Pallet changing systems • Suggestions for facilitating Cutting tools (TC) • Standard tool stations • Tool nose radius comp offsets • Assemble tools off line • Quick change tooling Workholding setup (TC) • Clamping pressure • Reuse soft jaws • Tailstock • Changing parameters • Removing workholding device • Mounting jaws • Quick jaw change chucks • Chucking rings • Chucking tool • Machining soft jaws • Jaw boring custom macro Assign program zero (MC) Program optimizing • Qualifying setups • Calculating assignment values • Measuring first time • Programming entries • More on sub-plates • Spindle probe • Using edge finder as probe • Effects on setup time • CAM systems and optimizing • Tool path plotters • Variables for cutting conditions Click on a topic! Assign program zero (TC) • Geometry offset usage • Tool touch-off probes

  5. Two Task Types Related To Setup

  6. On-line tasks: Tasks done while the machine is down between production runs Off-line tasks: Tasks done while the machine is in production for the next (or some future) setup Two setup-related task types: Setup time is the sum-total of all on-line tasks!

  7. Two setup-related task types: Tasks commonly done while the machine is down • Tear down old setup & put everything away • Clean machine • Make new setup • Cutting tool tasks • Assemble, measure, and enter offsets for • Assign program zero • Measure position and enter fixture offsets • Load program • Verify program • Optimize program The fewer the people in the CNC environment, the more tasks tend to be done on line