1 / 3

BR 1-159 – Bridge Replacement project on James Street Over Christina River

Christina River Bridge is located in Wilmington, Delaware. This existing bridge BR 1-159 is structurally deficient as its movable portion is inoperable due to heavy corrosion and section loss in its steel superstructure. The BR 1-159 Bridge Replacement project on James Street Over Christina River is a vital project for the Town of Newport.

encardio
Download Presentation

BR 1-159 – Bridge Replacement project on James Street Over Christina River

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ONE STOP MONITORING SOLUTIONS | HYDROLOGY | GEOTECHNICAL | STRUCTURAL | GEODETIC Over 50 years of Excellence through ingenuity PROJECT DOSSIER BR 1-159 BRIDGE ON JAMES STREET OVER CHRISTINA RIVER PROJECT PROJECT OVERVIEW BR 1-159 BRIDGE ON JAMES STREET OVER CHRISTINA RIVER New Castle County, Delaware, USA Project Location This replacement project that entails construction of a new 393’-11 7/8”, 5- span bridge on James Street over River in New County, Delaware. is a bridge Client Contractor Consultants Wang Tech Duration Christina Castle The existing bridge BR 1-159 is structually deficient, with its movable portion inoperable. Its steel superstructure exhibits heavy corrosion and section loss. The new bridge structure is being constructed just east of the existing bridge alignment. It is 393’-11 7/8” long with 5 spans. The span lengths vary from 55’-5 1/2” (Span 5) to 88-1 1/8” (Span 2). The structure has a curb-to-curb width of 28 feet and a 10-foot wide bike and pedestrian way. The out-to-out width of 42’- 5 ½” consists of two 12-foot lanes, two 2-foot shoulders, two 1’-8 1/4” parapets and 1’-1” for a handrail. The deck elevation at the centerline is 12.76 feet at Abutment A and 12.5 feet at Abutment B. The maximum embankment height is approximately 9 feet at Abutment A and 5.5 feet at Abutment B. www.encardio.com

  2. WHY MONITORING? The instrumentation monitoring plan included installation of geotechnical instrumentation to monitor subsurface soil conditions around the existing seventy-two (72) inch Christina River Force Main (CRFM) concrete sewer pipe. The Christina River Force Main, constructed in 1974, is a 72” Prestressed Concrete Cylinder Pipe (PCCP) with Flow Rates of 50 Mgpd (dry) to 200 Mgpd (wet), serving the entire New Castle County, and has little to no system redundancy. As such, protecting the utility against adverse impacts associated with equipment loads, ground settlement and vibrations as a result of the planned construction activities, including, but not limited to, the construction of any temporary works over and/or adjacent to the CRFM, is of paramount importance at this project. MONITORING SOLUTION Rite Geosystems Inc., our USA Company was enstrusted to provide complete instrumentation for the project. Scope of works include: Supply of geotechnical instruments Automatic monitoring with dataloggers Figure 1: Instrumentation schematic www.encardio.com

  3. INSTRUMENT USED Used to monitor the biaxial lateral soil movement to verify that movements are within design tolerances In-place inclinometers Piezometers Used to monior the pore water pressure Datalogger Automatic dataloggers with GSM/GPRS modem RESULTS Monitoring of the above mentioned instruments has been executed successfully, giving the client necessary information required for smooth progress of the project. Figure 2 Instrumentation installation photograph from site ENCARDIO-RITE ELECTRONICS PVT. LTD. A-7, Industrial Estate, Talkatora Road Lucknow, UP - 226011, India | P: +91 522 2661039-42 | Email: geotech@encardio.com | www.encardio.com International: UAE | Qatar | Bahrain | Bhutan | Morocco | Europe | UK | USA India: Lucknow | Delhi | Kolkata | Mumbai | Chennai | Bangalore | Hyderabad | J&K www.encardio.com

More Related