1 / 1

Measuring Your Test Environment Management | Enov8

A key component of Test Environment Management is the ongoing measurement and optimization of your TEM practices. For more information visit us at : http://enov8.com/products/ecosystem-em/

enov8
Download Presentation

Measuring Your Test Environment Management | Enov8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEM METRICS & INDICATORS A key component of Test Environment Management is the ongoing measurement and optimization of your TEM practices. Below is a list of metrics and indicators that should be captured as part of establishing a Test Environment Management capability. Note: These are not exhaustive, however capturing this information will set you on your way to implementing a successful TEM services organisation. ENVIRONMENT AVAILABILITY • Availability of Environment • Availability of Systems (Instances) ENVIRONMENT USAGE • Historical Usage of Test Environment Systems (Instances) • Future (Planned) Usage of Test Environment Systems (Instances) ENVIRONMENT COVERAGE • % of Test Environment Systems (Instances) under management (within CMDB) • % of Test Environment Systems (Instances) with rich knowledge (IP) attached ENVIRONMENT AGILITY • Time to Set Up an E2E Environment • Time to Setup Systems (Instances) OPERATIONAL METRICS – DATA REFRESH • Number of System Data Refreshes • Time to do a Data Refresh • % of Failed v Successful Data Refresh’s • % of Tasks Automated versus Manual OPERATIONAL METRICS - CHANGE • Number of System Changes • Outage caused by Change • % of Failed v Successful Changes • % of Tasks Automated versus Manual OPERATIONAL METRICS - RELEASE • Number of System Releases • Outage caused by Release • % of Failed v Successful Releases • % of Tasks Automated versus Manual Learn more at Enov8.com

More Related