1 / 15

CHRISTCHURCH QUAKE

CHRISTCHURCH QUAKE. NZDF RESPONSE SSGT PAUL DUNNE. Topics to Cover. Overview Earthquake & Effects NZDF Response RIP Lessons Learnt. Exercise Torque Wrench/ OP Cant Quake. Op within construct of Ex Southern Katipo. Tri service Task Force mounted. 1 x EHO, 2 x EHT = EH Det.

Download Presentation

CHRISTCHURCH QUAKE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHRISTCHURCH QUAKE NZDF RESPONSE SSGT PAUL DUNNE

  2. Topics to Cover • Overview • Earthquake & Effects • NZDF Response • RIP • Lessons Learnt

  3. Exercise Torque Wrench/ OP Cant Quake • Op within construct of Ex Southern Katipo. • Tri service Task Force mounted. • 1 x EHO, 2 x EHT = EH Det. • Depart Napier 21st Feb, Onward to Lyttleton.

  4. The Earthquake • 6.3 magnitude earthquake, which struck at 12:51pm on 22 February 2011 • Epicentre was east of Christchurch, near the town of Lyttleton.

  5. The Effects The quake caused widespread damage: • Power outages • Major buildings and many homes damaged • Loss of water and water quality • Loss of sewage system • Significant road damage • Temp loss of medical facilities • Building fire • Airports closed • Injuries/Loss of life

  6. Response • Torque wrench cancelled. • Initial responses for Lyttleton was mounted. • First contact made with CDHB & 2HSB(NZ). • Enter Christchurch. • 2 HSB(NZ) send reinforcements(2 x EHO, 4 x EHT 2 x NMV’s & Section packup) • Arrive ChCh Women's Hospital.

  7. CDHB

  8. CDHB

  9. Task • CDHB link Kirsty Macleod and Denise Tulley. • Lt Buckland 3LFG link. • Lt Shaw CDHB link. • Muster equipment & Presence /absence samples taken for Hospital. • City Spilt into regions & sampling commenced • Equipment & Vehicles loaned out.

  10. TASK • Working Hours 0730hrs – 1700hrs • 30 – 40 samples collected per day. • 100km covered per day.

  11. Relief in Place • Relief in place (RIP) conducted to relieve initial teams 09 Mar 2011 • Contained Airforce elements (Flight Colin Edie), 2 HSB (NZ) TF EHO (Cpt Campbell), EHT (Pte Khan) and medics (Lcpl Albert & Pte Leadbetter). • Two day period AO familarisation.

  12. Lessons Learnt • No Concept of Army EHO/EHT abilities and capabilities • Labs (incubators if needed) • FAC testing • Communications • Cellphones • Pre-Agreements Required with Emergency Response Authorities, • Maintain/create contacts

  13. QUESTIONS

More Related