1 / 13

UPDATE ON THE DEVELOPMENT OF A BOREHOLE GRAVIMETER FOR MINING APPLICATIONS SEIGEL, CHOUTEAU, GIROUX & NIND

UPDATE ON THE DEVELOPMENT OF A BOREHOLE GRAVIMETER FOR MINING APPLICATIONS SEIGEL, CHOUTEAU, GIROUX & NIND. Applications of BH Gravity in Mining. Remote Detection Massive Sulphide Deposits Other Types of Metallic Deposits Non-Metallic Deposits

erek
Download Presentation

UPDATE ON THE DEVELOPMENT OF A BOREHOLE GRAVIMETER FOR MINING APPLICATIONS SEIGEL, CHOUTEAU, GIROUX & NIND

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UPDATE ON THE DEVELOPMENT OF A BOREHOLE GRAVIMETER FOR MINING APPLICATIONS SEIGEL, CHOUTEAU, GIROUX & NIND

  2. Applications of BH Gravity in Mining Remote Detection • Massive Sulphide Deposits • Other Types of Metallic Deposits • Non-Metallic Deposits • Verification of Surface and Airborne Gravity Anomalies Bulk Density Determinations and Applications to Mining • Deposit evaluation • Improved grade control • Relative local rock strength • Monitoring integrity of dams and tailings ponds

  3. REMOTE DETECTIONKelly Lake: Near Miss

  4. BULK DENSITYPNNL Waste Treatment Plant, Hanford, WA ρ = g’/(4πG) = 0.01193 g’

  5. “Gravilog”BHG for Mining

  6. GRAVILOG Development • Three year development & testing • Funding: • Industry (CAMIRO) • CVRD Inco, BHPB, Areva & Schlumberger • Canadian Government (IRAP) • Scintrex • Work Plan • Product development at Scintrex • Modelling software at École Polytechnique • Start: Oct 2005 • Field Tests in Boreholes: mid 2008

  7. GRAVILOG Design Layout

  8. GRAVILOG Sensor Housing

  9. GRAVILOG User Interface

  10. GRAVILOG Modeling Software

  11. GRAVILOGSystem Test Program BENCH TESTS • Individual components tested prior to assembly • Complete prototype system SHAKE – DOWN TESTS • Borehole near Lindsay (Sir Sanford Fleming) • Proper functioning of all Gravilog modules & sensors • S.D of one minute measurements • Repeatability • Debugging • Efficient logging procedures OPERATIONAL TESTS IN SPONSORS’ BOREHOLES

  12. GRAVILOGBHG for Mining Applications • Development nearing completion • Modeling software complete • Industry sponsors’ boreholes: mid 2008 • Production logging system: January 2009

  13. CREDITS • CAMIRO – Tom Lane • CVRD Inco – Alan King • BHP Billiton – Peter Diorio • Areva – Grant Nimeck & Rod Koch • Schlumberger – Harold Pfutzner • IRAP – Ramesh Gupta • Sir Sanford Fleming College