1 / 10

Scope

Revised Draft JTP for Hydraulic & Pneumatic Actuators HCAT Meeting at Toronto, Canada National Technical Systems / Elwin Jang / 916-392-6163 August 28-30, 2001. Scope. Significant Information Teleconference on 7 Aug to discuss JTP Coatings & Substrates

eric-barber
Download Presentation

Scope

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Revised Draft JTP for Hydraulic & Pneumatic ActuatorsHCAT Meeting at Toronto, CanadaNational Technical Systems / Elwin Jang / 916-392-6163August 28-30, 2001

  2. Scope • Significant Information • Teleconference on 7 Aug to discuss JTP • Coatings & Substrates • Fatigue Testing – Converted into Draft Performance Work Statement (PWS) • Functional Hydraulic Testing – Appendix B, Draft PWS • Corrosion Testing

  3. Teleconference on 7 Aug • Recommended Changes Included • Consider Changing “Grit Blast with 54-grit Al Oxide at 60 PSI” to “54-60 Mesh Al Oxide at 40-60 PSI for Steel; Clean Ti with Acetone, Do Not Blast to Avoid Imbedding Grit & Create Stress Risers” • Need to Clarify “Deposit to Almen Number of 6-20N”; This is a Very Broad Range • Delete Specifying Quantities of Gases and HVOF Application Instructions; Replace with “Apply HVOF Coatings to Comply with QC Coating Performance Requirements.”

  4. Coatings & Substrates • Selected HVOF Coatings - WC/Co-Cr, WC/Co, Tribaloy T-400, Cr3C2/NiCr • Also Will Test Electroless Ni on Several Piston Heads in Functional Hydraulic Testing • Selected Substrates: 4340 steel, PH15-5 SS, PH13-8 SS, HP9-4-30 steel, & Ti10-2-3 Ti • Replaced PH14-7 with PH13-8 per NAVAIR & GE/Jerry Schell recommendations

  5. Fatigue Testing • Converted Fatigue Section in JTP into PWS • HVOF Coatings will be Ground to 2-5 Ra, Except for Tribaloy T-400 to 10-14 Ra • Only Test R = -1; Delete testing R = 0.1 • R = -1 is a more stringent test • Since we know the shape of S/N curves, full curve (4 stress levels) for uncoated specimens; only highest & lowest stresses for coated specimens (~110 & 80 ksi); Total 740

  6. Functional Hydraulic Testing • Shamban Provided Flight Control & Utility Actuator Duty Cycles & Test Procedures • Greene Tweed Coordinated Above • Included a Piston Head in Middle of Rod Specimen • One Section of Rod Specimen Ground Finish & Another Section Superfinish for Comparison

  7. Superfinishing • The chrome baseline test rods will be superfinished to the following surface control specifications: • Ra = 4 to 8 in • Rtm = 40 in. max • Rp = 24 in. max. • Rsk = -0.5 to –1.5 • Tp = 50 to 70% @ depth p= 0.25 Rtm

  8. Superfinishing (cont.) • The HVOF coated test rods will be superfinished to the following surface control specifications: Ra = 2 to 5 in (10 to 14 in control specification for Tribaloy T-400) Rpk = <1.8 in. Tp = </= 85% at 4in. >/= 60% at 8in.

  9. Functional Hydraulic Testing (cont.) • Mil-PRF-83282 Hydraulic Fluid • Mil-P-83461 Nitrile Elastomeric Seals for Withstanding 275oF • Expose Seals from –65oF to 275oF • Test Conditions • Flight Control Actuator – 6M Cycles; Dithering • Utility Actuator – 450K Cycles; Longer Strokes • Side Load –72 lbs

  10. Corrosion Testing • Neutral Salt Fog or Sulfur Dioxide Tests • Rod Specimens • HVOF Coatings – 2-5 Ra Finish • 2 Specimens per Test • Total Number Specimens – 98

More Related