QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014

QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014. We develop, transport and deliver clean energy. Questar’s Pipeline System. ®. The Flow of Natural Gas. City Gate. Questar Rate Structure. Firm. Interruptible.

erica
Download Presentation

QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. QUESTAR GASTransportation BalancingSusan Davis, Director, Account & Community RelationsFebruary 28, 2014 We develop, transport and deliver clean energy

  2. Questar’s Pipeline System ®

  3. The Flow of Natural Gas City Gate

  4. Questar Rate Structure Firm Interruptible Minimum Annual DTH Residential/Commercial 7000 Sales GS, FS Commercial/Industrial IS Annual Contracts Market Based FT-1, TS Minimum Annual Volumes Large Transportation (with firm TS 120,000 DTH (FT-1) Commercial/Industrial demand) GS - Daily volumes not to exceed 1,250 DTH in any one day during the winter season. FS - Daily volumes not to exceed 2,500 DTH in any one day during the winter season. Qualifications: Annual dth over 2,100 dth, Load Factor 40% or higher

  5. Transportation Balancing Restrictions • Daily … typically +/- 5%. • Can be restricted to no over or under deliveries based on system operating constraints. • Violations of the daily restrictions are subject to penalties as provided in the tariff.

  6. Transportation Balancing Restrictions (continued) • Monthly… must be within +/- 5%. • Imbalances may be traded through 15 days after month end closing. • Balances not traded within that time are subject to cash out or gas sale provisions provided in the tariff.

  7. Interruption Procedures

  8. Supply Curtailment vs. Interruption • Deliveries to the city gate are the responsibility of the transportation customer. • If gas is not delivered to the city gate, QGC is not responsible to supply gas to TS customers, even if customer has firm capacity on QGC. • Gas delivered to TS customers may be limited to contracted firm amount or daily nomination, whichever is less. • QGC release capacity is recallable. • Flexed firm capacity is firm, but it is a lower priority.

  9. QGC History of Interruptions • December 5, 2013 Supply Curtailment • Winter 2000-01 three interruptions • Two Northern • One Southern • January 1997 for 36 hours • First partial interruption • December 1990 for 9 days • First interruption since 1982

  10. Interruption Process • Winter interruption season: • November through March • But interruptions can happen any time during the year • Simultaneous interruption • Both sales (IS) and transportation (TS) • Geographic interruption possible • Partial interruption possible

  11. Interruption Procedures • Customers will be notified by QGC account management personnel –day or night • Notify QGC if interruption contacts change –educate all involved in the process • Two-hour maximum allowance to interrupt gas service

  12. Failure to Interrupt • Penalty • Distribution non-gas component: $15/dth • Supplier non-gas component: $5.71 • Gas-cost component: Highest purchased gas during period of interruption = $4.75 on Dec. 5, 2013 • Total = $25.46/dth • Meter shut-off may be used to maintain system integrity

  13. Gas Supply Discussion • Nominations/Scheduling Process • NAESB Cycles • (North American Energy Standard Board) • Events of December 5th, 2013

  14. Evening Nominations (Cycle 2) Sent by 5:00 pm to the TSP by 5:15 pm Confirmations by 8:00 pm Scheduled by 9:00 pm Timely Nominations (Cycle 1) Sent by 10:30 am to the TSP by 10:45 am Scheduled at 3:30 pm Intraday 1 Nominations (Cycle 3) Sent by 9:00 am to the TSP by 9:15 am Confirmations by 1:00 pm Scheduled by 1:00 pm Intraday 2 Nominations (Cycle 4) Sent by 4:00 pm to the TSP by 4:15 pm Confirmations by 7:00 pm Scheduled by 8:00 pm 8:00 am GD2 Gas Flow 8:00 am GD2 Gas Flow 4:00 pm GD2 Gas Flow 8:00 pm GD2 Gas Flow Gas Day 2 Gas Day 1 - December 5, 2013 - December 4,2013 Reductions for (GD5) - 2,348 Dth 10:00 am Nominations in for Dec 5th (GD5) - 154,953 Dth 1:00 pm - Official cut notifications were sent out to transportation customer’s agents as part of the confirmation of the ID1 cycle 9:45 am QGC notified by QEP of cuts at Blacks Fork and Red Wash plants - QGC started working with scheduling to determine the extent of cuts for transportation customers Evening Noms for (GD5) - 139,945 Dth 7:00 pm - Questar Gas notified customers that they could resume usage to match their increased supply that was scheduled to arrive at 8pm. 12:00 pm - A list of customers that required reductions was sent to Questar Gas account representatives 8:30 am and 10:00 am LeRoy and Chalk Creek aquifers to withdrawal (Coalville was already on withdrawal) 7:30 am QGC Gas Supply purchases gas (ID1) to make up for assumed cuts at Blacks Fork 6:00 am – QGC Gas Supply notices reduced flow from Blacks Fork (Pipeviewer)

  15. QUESTIONS? Thank You.