An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapiter 7 (part II-2) Isabelle Majkowski SCK●CEN Isabelle Majkowski, SCK●CEN and chapter 7

  2. Optimizing the development of Clearance methodologies Difficult to reach a full set of Clearance methodology. But respecting the following steps should help: • Phase 1: Preliminary survey • Phase 2: establishing methodologies that ensure compliance to clearance level • Development of methodologies • Selection of the instrument • Validation of the instrument • QA • Material management programme (before clearance)

  3. Phase 1: Preliminary survey Planning: Inventory and distribution of the radionuclides likely to be present: Those data are obtained through: • a good knowledge of the plant and its process streams • theoretical calculations of induced activity • measurement samples taken during operational and maintenance tasks • after shut down of the plant -> preliminary monitoring survey.

  4. Phase 1: Preliminary monitoring survey- Instrumentation localization of radioactive sources, allowing perfect superimposition of the gamma and video images of the observed site: Gamma camera • Collimated • Digital image resolution: 768 x 572 pixels • Standard field of view: 50° • Spatial resolution: from 1° to 2.5° depending on energy and field of view • CSI(Tl) detector Gamma scan • the camera moves to scan the surface • NaI(Tl)

  5. Phase 1: Preliminary monitoring survey- Instrumentation Samples – smear test: • taken on a representative way or at places where the risk of contamination/activation is maximum. • treatment of the sample • measurement of the sample Use to: • confirm calculation, gamma cam. or historic knowledge • Evaluate the isotopic ratio • verification of the migration of radionuclide

  6. Phase 2: Development of methodologies • Grouping of material (describe in a Certificate) • Define the scope (group) • Historic (poss. Incidents) • Decontamination process • Characterisation of the material • (solid, porous, fibrous, shape) • Radiological characterisation • isotopic ratio • nature of radioactivity (fixed, homogeneous distribution) • Non-radiological risks • CL

  7. Surface contamination measure - beta - 100 cm² measure Agent R.P. dec. new path yes go – no go ? Surface contamination measure - beta - 100 cm² No measure no go Go – no go ? Go measure ment form IDPBW methodology – flat & clean material

  8. Flat surface with 2 hand held monitors • Certificate • Scope: flat clean surfaces • ratio: 80% Co-60 - 20% Cs-137 (worst case assumption !!!) • Measurement methodology • surface measured 2 times with 2 distinct handheld monitors and by 2 distinct operators. • Release measurement procedure based on: • ISO 11932: "Activity measurements of solid materials considered for recycling, re-use, or disposal as non-radioactive waste" • ISO 7503: "Evaluation of surface contamination – Part 1: Beta-emitters (maximum beta energy greater than 0.15 MeV) and alpha-emitters".

  9. Hand held monitor (dual probe)Setting of optimal HV

  10. 2 4 q1 q2 q3 q4 q5 q6 Hand held monitor (dual probe) Calibration • Wide area reference source • Class 2 reference source (ISO 8769) • C-14, Co-60, Cs-137, Cl-36, Sr-90/Y-90 and Am-241. • Instrument efficiency (ISO 7503-1) at 5 mm.

  11. Hand held monitor (dual probe) Measurement • Control with check sources • ISO 7503: deviation < 25 % expected value • SCK-CEN: deviation < 10 % beta emitters - 20 % alpha emitters

  12. Justification & validation • Detection limit (cps) < Clearance level (cps) • Detection limit - ISO 11929: • k1-a, k1-b : function of alpha and beta error • R0 : back-ground level (cps), • t0 : duration of the BG measurement (s), • tb: duration of the measurement (s). • Clearance level (cps) = alarm level (cps) • CL: Clearance Level (Bq/cm²), • Svue: surface  ’sees' by the probe (cm²), • 4 hglob: global efficiency of the instrument !!!!!!!!!

  13. Justification and validationISO 11929

  14. Definition of the K factor • ISO 11929 : k factor • Surface density of absorbent layer • Distance between source and detector • SCK data bank • maximum and minimum diameter that can be measured for a defined measurement duration • Internal • external • attenuation with distance for our own probe • measurement of concrete

  15. Assumption of the ratio… • Assumption of the ratio (control beta) • BG = 10 cps, no attenuation, beta probe • Assumption of the ratio (control alpha + beta) • BG = 10 cps, no attenuation, dual probe

  16. HPGe HPGe HPGe Control Operator BR3 dec. new path yes Hot spot ? No ESM no go Go – no go ? Go Q² Safeguards < CL Result ? < CL measure ment form IDPBW methodology – scrap material Surface contamination control - beta - 100 cm² Gross gamma counting - 20 kg - gamma Gamma spectrometry - 200 kg - gamma

  17. Step 1: Control • k1-a, k1-b ,R0  en t0 are fixed • tb = 1 s hglob is fixed Detectable ‘Hot spot activity’ = …. Bq

  18. ‘ Improved ’ Gross gamma counting CCM ESM FHT 3035

  19. ESM - 4 channels Cobalt Coincidence Measurement

  20. 14 11 12 13 7 10 7 9 8 Calibration & control Every 6 month: • Fine adjustment of the HV • Calibration with Co-60 and Cs-137 linear sources in a mass of metal tube of 17.5 kg Before use: • control with point sources on a bloc of 7 kg • criteria: deviation < 10 % expected value

  21. Validation of the system Test in extreme conditions (point source) Test in measurement conditions (17.5 kg) • safe side: always overestimation of the activity • if mass < 23 kg -> overestimation – less shielding • if mass > 20 kg -> alarm in Bq • alarm = detection limit -> software calculates the measurement time in function of the BG. • Algorithm to calculate Cs-137 value do not work.

  22. Extention of the scope to concrete • Activation product: Ba-133 • 80 keV (37 %) • 360 keV (56 %) • 300 keV (22 %) • efficiency: 16 % integral • Natural element: K-40 • 1.46 MeV (11 %) • efficiency: 6 % integral !!! • As = 0.05 Bq/g

  23. Alarm in Bq/g fct of the ratioin the integral channel • Integral channel: • Efficiency correction factor • ratio • Alarm:

  24. Alarm level if function of the isotopic ratio • Assumption of more Co-60 than Cs-137: • If in reality there is more Cs-137 alarm level could had been higher. • Radioelement with low efficiency have high CL, there is a kind of equilibrium.

  25. 100 79 67 36 Step 3: Spectroscopy HPGe detectors Q² • Detectors: • HPGe cooled by liquid nitrogen (2 fillings/week) • Relative detection efficiency 20 % per detector • Measurement chamber: • shielding with 15 cm low BG steel • turntable (10 rpm) • drum 220 l • load cell to measure weight from 10 to 400 kg • Total weight: 8000 kg • System already incorporated in QA approach (validation done)

  26. Step 3: Spectroscopy HPGe detectors Q²

  27. Step 3: Spectroscopy HPGe detectors Q²

  28. ROI Spectroscopy HPGe detectors Q²calibration • Adjustment of the amplifiers gain • Gamma peaks of the 3 spectra • are in the same ROI • 2. Calibration with 4 reference drums • filled with material density 0.02 g/cm³ - 1.83 g/cm³ • approximation of homogeneous distribution of activity

  29. Spectroscopy HPGe detectors Q²Errors • Error due to systematic variation of the background. • Error due to the unknown material composition • Error caused by activity distribution • Error caused by the filling height of the drum. • Errors are much more important for: • low energy gamma emitters • high density of matrix • and is mainly due to unknown activity distribution. • The energy of the gamma emitted by Cs-137 and Co-60 are high, and the general error will be small. • The detection limit for Co-60 and Cs-137 is of the order of some mBq/g for a 10 minutes count of a 200 l waste drum. Which is well below the Clearance Level.

  30. Other devices…In Situ Object Counting System ISOCS: • portable Ge detector, • flexible portable shielding/collimator system, • mathematical efficiency calculation software that requires no radioactive sources • and data analysis software. • Modelisation of the object to be measured • Simple geometry of the object • Assessment of the position of the source (homogene, linear punctual)

  31. position 1 position 2 10 cm 10 cm Other devices…Tunnels • 2 detectors: • position 1: 60° + 60° = 120° • position 2: 180° + 60° = 240° • 4 detectors • position 1: 60° + 60° + 180° + 60 °= 360° • position 2: 180° + 60° + 60°+60°= 360 °

  32. Other devices…Air ionisation measurement Passing a anode wire in the center of the tube -> use the tube as an ionisation chamber: • detection: few Bq in 2 m in 30 secondes ~ 0.001 Bq/cm³

  33. Indirect measurements: Samples • Difficult to validate their representativity: taken & treatment • used when contamination consists mainly of low energy beta or alpha emitters on surface that are difficult to access. (3H, 14C, 55Fe, 59Ni, 63Ni and 99Tc) • smear test : efficiency ???

  34. Passive & active neutron measurement

  35. Conclusions… • Still a lot of international discussion on: • Exemption / Clearance • NORM / nuclear industry • Instrumentation market offers instruments that measure at Clearance level. • Unknown (preliminary phase) -> worse case scenario: • longer measurement • less clearance • Alpha contamination !!!