1 / 42

Severity 4 & 5 observations Aug ’2010 East Region

Severity 4 & 5 observations Aug ’2010 East Region. Total severity 4 and 5 observation for the month of Aug.’10:- 22 Nos. Severity 4: – In order to fix the roof monitor purlin a worker came on the inclined bracings. _CSP(East) Action Taken: Activity stopped and counseling done. .

erik
Download Presentation

Severity 4 & 5 observations Aug ’2010 East Region

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Severity 4 & 5 observations Aug ’2010 East Region

  2. Total severity 4 and 5 observation for the month of Aug.’10:- 22 Nos.

  3. Severity 4: – In order to fix the roof monitor purlin a worker came on the inclined bracings. _CSP(East) Action Taken: Activity stopped and counseling done. .

  4. Severity 4 :- Handrail missing on the top platform of scaffold. _Siemens Kharagpue(East) Action Taken: Scaffolding dismantled and provided another roof access.

  5. Severity 4 :- Lifeline ropes were found sagging on crane beam level. _Siemens Kharagpue(East) Action Taken: Activity stopped and life line fixed proper manner.

  6. Severity 4 & 5 observations Aug. ’2010 West Region

  7. Total severity 4 and 5 observation for the month of Aug.’10- 51 nos.

  8. Severity 4:- Roofing work started with out Access to Roof(Labour accessing roof by climbing on girt.) (Bafna Nasik-Prathmesh.) (MH) _West Action Taken: Work was stopped and asked builder site In-charge to provide Scaffold immediately.

  9. Severity 5:-Purlin was being used for Sag Angle fixing instead of Sag Angle Platform. (Bafna Nasik -Prathmesh.) (MH) _West Action Taken:- Work Stopped . Asked builder to provide Sag Angle Platform immediately.

  10. Severity 5- Life line post distance not as per STD. (Indo Euro -Suryodaya.) (MH)_West Action Taken: -Instructed Supervisor to maintain safe distance (Corrected)

  11. Severity 5-Scaffold erected not as per STD. & Checklist not maintained (Outriggers, Fall arrester, Platform, Rungs not provided.) (Indo Euro -Suryodaya.) (M)_West Action Taken:- Asked to re-Erect it immediately (Closed)

  12. Severity 5- Non Standard Rope Ladder was being used (Indo Euro -Suryodaya.) _(MH)West Action Taken: Removed from site.

  13. Severity 4- Life Line Bracket removed before completion of Secondary work .(Jyoti Plastic-R.K. Builder)(GJ) _West Action Taken:- Work was stopped and asked site supervisor put loose life line. (Closed)

  14. Severity 5- Hydra w/o Safety Latch & limit switch .(Jyoti Plastic- R.K. Builder)(G) _West Action Taken:- Stop work immediately. Hydra removed from Site and warning letter issued

  15. Severity 5- Flash Back arrestors provided only on torch side & fire extinguisher not available (Jyoti Plastic- R.K.Builder.) (G)_West Action Taken: Work was stopped and asked builder site In-charge to provide Flash Back arrestor both side immediately. (Closed)

  16. Severity 5- Assembly work was being done manually instead of mechanical lifting. (Jyoti Plastic-R.K. Builder.) (GJ)_West. Action Taken:- Asked builder Staff to provide hydra for same immediately. (Closed)

  17. Severity 5- Man Basket found at site. (Jyoti Plastic –R.K. Builder) (GJ) _West Action Taken: Work Stopped . Asked Builder In-charge to remove from Site.(Closed)

  18. Severity 4- Life line post not used for erection “T” column.(Linit Tech.–R.K. Buikder.) (GJ)_West Action Taken: Training imparted on “Safe erection procedure” and asked builder to provide life line post ( Meeting conducted with Builder)

  19. Severity 4- Non Standard scaffolding erected for de sling purpose.(Linit Tech.–R.K. Buikder.) (GJ)–West Action Taken:- Asked builder site supervisor to mobilized 4 sets of scaffolding 8 meter height with vertical ladder with fall arrestor.

  20. Severity 5 –.Manila rope used instead of U clamp for tying guy rope.(Linit Tech.–R.K. Buikder.) (GJ)–West Action Taken:- Asked builder to mobilize “U” clamp. (Closed)

  21. Severity 4 & 5 observations June ’2010 TN Region

  22. Total severity 4 and 5 observation for the month of Aug.’10- 19 Nos

  23. Severity 4-: Improper jointing of electric cable – (Perlos site site)_TN Action Taken: - Builder changed

  24. Severity 4-: Roof purlins not fixed completely no fall protection – (Perlos site site)_TN Action Taken: Instructed supervisor to provide fall protection and fix the purlins as per procedure Builder Changed

  25. Severity 4-: Worker found working on the rafter without any fall protection. – (Perlos site site)_TN Action Taken: Work stopped and instructed supervisor to provide fall protection (Builder changed)

  26. Severity 4-: Workers found working on non standard scaffolding- (Sheenlac site) TN Action Taken: Stopped work and asked to provide proper scaffolding (Closed)

  27. Severity 4-Grinding Machine being used without guard . –( Perlos site) TN Action Taken: Stopped work and asked to provide guard for wheel and Builder Changed

  28. Severity 4-: Naked wires found directly inserted in to the distribution board. - (Sheenlac site) TN Action Taken: Stopped work and instructed supervisor to used plug top (Closed)

  29. Severity 4-: Workers found working in unsafe manner – (Nokia seimens)TN Action Taken: Stopped work and instructed supervisor top provide access

  30. Severity 4-: Oil leak observed for 30 ton crane – (Nokia siemens)TN Action Taken: Stopped work and instructed supervisor to rectify the same.

  31. Severity 4 & 5 observations July ’2010 AP &K Region

  32. Total severity 4 and 5 observation for the month of Aug.’10- 18 Nos

  33. Severity 4-: Damaged Web sling been used for shifting of material – Carlsberg (AP) Action Taken: Instructed supervisor to replace with new one (Closed)

  34. Severity 4-: Scaffolding material been shifted without tying guide ropes- Jindal saw(AP) Action Taken: Stopped work and asked to provide guy ropes. Training conducted for all workers.

  35. Severity 4-: Life line not provided continuously - Carlsberg (AP) Action Taken: Stopped work and asked to provide life line

  36. Severity 4-: Ladder found used as sag angle platform ( Repeated violation). Carlsberg (AP) Action Taken: Stopped work and instructed to use sag angle platform

  37. Severity 4-: Compressed gas cylinders' without flash back arrestor and not positioned properly, poor LPG cylinder condition – Carlsberg (AP) Action Taken: Stopped work and asked to provide flash back arrestors (Closed)

  38. Severity 4-: Scaffolding side supports not provided properly and not anchored properly to the structure. – Omshakthi (AP) Action Taken: Stopped work and instructed supervisor to anchor the structure and provide side supports properly (Closed)

  39. Severity 4-: Workers found standing on purlins and working.- Omshakthi (AP) Action Taken: Stopped work and asked supervisor to provide proper working platform

  40. Severity 4-: Scaffolding wheels not having locks. Om shakthi (AP) Action Taken: Instructed supervisor to fix lockable wheels to scaffolding (closed)

  41. Severity 4 & 5 observations Aug. ’2010 North Region

  42. Total severity 4 and 5 observations for the month of Aug’10:- 07 Nos.

More Related