1 / 29

“ Exploring the Untapped Potential of the Gaspé Region”

“ Exploring the Untapped Potential of the Gaspé Region”. Forward looking statement.

eris
Download Presentation

“ Exploring the Untapped Potential of the Gaspé Region”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Exploring the Untapped Potential of the Gaspé Region”

  2. Forward looking statement Some statements in this presentation may contain forward-looking information. All statements, other than of historical fact, that address activities, events or developments that the Company believes, expects or anticipates will or may occur in the future (including, without limitation, statements regarding potential mineralization) are forward-looking statements. Forward-looking statements are generally identifiable by use of the words “may”, “will”, “should”, “continue”, “expect”, “anticipate”, “estimate”, “believe”, “intend”, “plan” or “project” or the negative of these words or other variations on these words or comparable terminology. Forward-looking statements are subject to a number of risks and uncertainties, many of which are beyond the Company’s ability to control or predict, that may cause the actual results of the Company to differ materially from those discussed in the forward-looking statements. Factors that could cause actual results or events to differ materially from current expectations include, among other things, without limitation, failure to establish estimated mineral resources, the possibility that future exploration results will not be consistent with the Company's expectations, changes in world gold markets or markets for other commodities, and other risks disclosed in the Company’s public disclosure record on file with the relevant securities regulatory authorities. Any forward-looking statement speaks only as of the date on which it is made and except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement.

  3. CompanyOverview • Symbol GCR on the TSX-V • Copper foccussed • Large land position (over 350 sq/km) in underexplored region • Strong management team and board • Strongshareholderlist

  4. Gaspésie Gaspé Peninsula has been grossly underexplored in the last 2 decades

  5. Planning Vortex and In Between

  6. Land position and sectors WaresBlock Landry Block Vortex MacDonald Block Murdochville A and B Jean B-O MacNeill Block Port Daniel

  7. Gaspé land position • The assets compilation in Gespegextends beyond 350 sq/km • Vortex over 68 sq/km approx., 29 meters @ 0.94%cu 2011 campaign • In Between 200 sq/km approx., Airborne geophysics in 2012, 436new targets and 141 priority targets • Port Daniel 30 sq/km option sept 2013 • B-O Project 9sq/km,17 claims South east of Vortex 2011 occurrence • Jean Project 22 sq/km 40 claims south of Murdochville Gaspe Copper Mine • MurdochvilleAAnd B 10 sq/km, Claims in the interior of XStrata properties • Quarry Project 15 sq/km approx. under evaluation,

  8. Copper Charts 25years 1 year

  9. Copper Charts Trends for global refinedcopperconsumption Refinedcopperconsumption for China

  10. “ Best place for new discoveries get close to past producing mines” • Gaspésie • Hosted • Gaspé Copper Mine from Noranda produced 141mt@. 85 % over 50 years. • Madeleine Mine 8.13mt@1.08%Cu withmolybdenum • SullipeckOccurence5.5mt@0.88%Cu (non 43-101) • Candego Mine operationfrom 1945-54 Zn,Pb,Cu et Au • Fédéral Mine Pb in production during the two W-W (1914-1918 et 1939-1945) Gaspé Peninsula has been grossly underexplored in the last 2 decades

  11. Type of Geologywanted Sideview of Gaspé Copper (Murdochville) Forillon Shiphead IndianPoint Source : Ministère des ressources naturelles

  12. Vortex Overview • Total claims : 130 • Square Kilometers: 68 • Type of project: Copper, Molybdenum, Gold • Skarn-Cu or Mantos-Cu Type of mineralizationwithin a hydrothermal system • 25 kilometers west of Murdochville • Known occurrences onVortex • Showing Vital • Showing Lisette • Sullipeckestoccurrence • Sullipeckoccurrence

  13. Vortex Overview SullipeckEast • 21 Historical surveys (1967-2001) • 12 Recent surveys • 2149 m DrillingSurvey by Kimpar in 2009 (Private Co.) • 2572m.Drillingand trenching in fall 2011 • Announcement of discovery in 2012 • 11v-04 29 metres @ 0.94% • Geophysic in 2012 • Geochemestry in 2013

  14. Vortex Overview Forillon Horizon • 11-V-04 vs 11-V-06 • L89-1 vs o9 K-04 Indian Point Horizon

  15. Vortex Overview • Drilling results from 1989, 2009, 2011 • The lower contact of the Forillon Formation: • 29.8 m à 0.94% Cu : DDH 11-V-04 • 21.0 m à 0.13% Cu : DDH 11-V-01 • 35.7 m à 0.18% Cu : DDH 11-V-05 • 1.9 m à 0.54% Cu : DDH 09-K-04 • The upper contact of the Indian Point Carbonate Formation. • 10.3 m à 0.57% Cu : DDH L89-1 • 11.2 m à 0.24% Cu : DDH 11-V-04 • 9.0 m à 0.15% Cu : DDH 11-V-06 • IP1. Horizon • 17.0 m à 0.3% Cu : DDH 11-V-04 • 7.0 m à 0.5% Cu : DDH 11-V-04

  16. Vortex Overview Sullipeck • 5.5Mt à 0.88% Copper (approx. non 43-101) • 46,535 metres over 347 surveys • Skarn type mineralization(Cu, Mo) • Conducive to an open-pit production • Occupies 0.15 square kilometers of Vortex 50km project

  17. MagSignature Murdochville MagSignature Sullipeck(Vortex)

  18. Vortex Overview J-V 43-101 resource calculation 2014 3000 to 5000 drilling program 2013 soil sampling, trenching and preparing for 2014 program 2012 announced discovery on Vortex 29 metres @ 0.94% cu

  19. “In Between” Project (original) • Total claims : 920 • Square Kilometers: 517 • Claimed in 2011 • Project type: Copper, Molybdenum, Gold • Program accomplish in 2012 : • Compilation of historical data • Regional structural interpretation (Images Spot and Landsat) • Airborne geophysical Mag (detail) • Report 436 targets 141 priority targets In Between Project 517sq/km

  20. Program accomplish 2013: • SoilgeochemicalsamplingfollowingCards (Diagnos)and Geophysicsurvey • Separate In Between in 4 Blocks 200 sq\km “In Between” Project (New) • To Do in 2014 • Preparefirst drillingcampaign • Surface work and geochemestry • Trenching and sampling

  21. “In Between” Project Drill 2014 Trenching 2013 Soil sampling on 62 targets and prospecting 2012 Intensive Gephysic Survey 436 targets with 141 priority 2011 Claiming of 517 sq/km

  22. Port Daniel Project • Port Daniel 30 sq./km option sept 2013 acquired, situated on the south side of the Gaspé Peninsula, • Geophysics survey in October 2013 • Prospecting and soil sampling in 2014

  23. Port Daniel Project

  24. R-Jean Project • Claimed in september 2013 • 10km south-west of Murdochville • Exploratory work in 2014

  25. Murdochville • MurdochvilleAAnd B 10 sq/km • Claims in the interior of Glencore- XStrataproperties • 5 claims on tailings of the Gaspe Mine • Evaluation and report in 2014

  26. Management, Directors and advisory board • Sylvain Laberge, President & CEO • Andrew Davidson, CA – CFO, Secretary and Director • Bernard-Olivier(B.O) Martel Geo. Vice-Presidentexploration • Tom MacNeill, Chairman of the Board • Tim Termuende, Independent Director • Denis Clement, Independent Director • Mr. Robert P. Wares, P.Geo., Advisor • Mr. Blais CPA, CGA, Advisor • Mr. Ronald Shorr, CFA, MBA, Advisor

  27. Financial Structure • Symbol: GCR • Sharesoutstanding: 55,508,512 • Shareholder: • 49 North Resources (46%) • Out of Qc Funds (8%) • Quebec funds(12%) • Management(15%) • Warrants: 9,737,580 • Options: 2,700,000 @ 0.15 • Sharesfullydiluted:67,946,092 • Low: 0,025 • High: 0,09

  28. Why Gespeg Copper? • A grossly underexplored region for more than 2 decades in one of the best jurisdiction in the world • Largest land position ever put together for copper and base metal exploration in Gaspé • Historic mining camp with highest grade copper production in its time Gaspé Copper 141 m/t @ 0.85% • Dedicated management with one goal , create value for shareholders • Committed shareholders (49 North, Sodemex, Management) Showing Vital Galery inside Sullipeck Showing Vital Showing Vital

  29. Sylvain Laberge President & CEO Tel: 514-380-5610 slaberge@gespegcopper.com Andrew Davidson Vice president and CFO Tel: 306-653-2692 adavidson@gespegcopper.com For Info: or THANK YOU Bernard-Olivier Martel, P. Geo, Vice-President Exploration of the Company, is a qualified person (as such term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects) and has reviewed and approved the technical disclosure contained in this news release.

More Related