Schedule( 2010-2016 ). 2015. 2016. 2014. 2017. 2011. 2013. 2012. ACTIVITY. J A J O. J A J O. J A J O. J A. J A J O. J A J O. J A J O. MILESTONES. Activities at TRIUMF.
E N D
Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN Timeline & Major Milestones 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block BEAMLINE: Kicker Design & Review Order/Fabricate/Deliver Install Septum Test Install Design Order/Mod Dipole Test Install Order/Fabricate Beamline (incl quads, PS, etc…) Test Install Design Order/Fabricate UCN APPARATUS: Spallation Target * Design/Prototype/Fabricate Install UCN Source Install/Test & Run @ RCNP Design/Fabricate UnInstall Install Shielding Install Design Procure shielding blocks COMMISSION @ TRIUMF Beamline Commissioning UCN Source Commissioning HELIUM LIQUEFIER: He Liquefier System Procure/Install Upgrade He Liquefier Procure Install * Joint RCNP/TRIUMF/Acsion effort
Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN Timeline & Major Milestones 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block BEAMLINE: Kicker Design & Review Order/Fabricate/Deliver Install Install Kicker Ceramic Beamtube Design/Order Fabricate Install Septum Test Install Design Order/Mod Dipole Test Install Order/Fabricate Beamline (incl quads, PS, etc…) Test Install Design Order/Fabricate UCN APPARATUS: Spallation Target * Design/Prototype/Fabricate Install UCN Source Install/Test & Run @ RCNP Design/Fabricate UnInstall Install Shielding Install Design Procure shielding blocks COMMISSION @ TRIUMF Beamline Commissioning UCN Source Commissioning HELIUM LIQUEFIER: He Liquefier System Procure/Install Upgrade He Liquefier Procure Install * Joint RCNP/TRIUMF/Acsion effort
Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN BL1U KICKER 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block KICKER: Kicker Design & Review Order/Fabricate/Deliver Install Install Design & Out for quotes (8) Bid Time & Place Order (29) Vendor final design & Fabr. (324) Acceptance tests & Receive (60) Unpack & Test (19) Ceramic Beamtube & Stands Design/Order Fabricate Install Design & Review (117) Finalize design & Order (71) Fabricate/Assemble (136) Prepare to Install (15)
Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN BL1U SEPTUM 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block SEPTUM: Septum Test Install Design Order/Mod Review & Finalize design (129) Place Order (15) Fabricate Septum Mods (80) Receive & Assemble Septum (110) Map & Test Septum (60) Prepare to Install (40) Vacuum Box & Stand Review & Finalize design (45) Place Order (15) Fabricate (95) Assemble (20) Prepare to Install (10)
Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN Timeline & Major Milestones 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block BEAMLINE: Kicker Design & Review Order/Fabricate/Deliver Install Install Kicker Ceramic Beamtube Design/Order Fabricate Install Septum Test Install Design Order/Mod Dipole Test Install Order/Fabricate Beamline (incl quads, PS, etc…) Test Install Design Order/Fabricate UCN APPARATUS: Spallation Target * Design/Prototype/Fabricate Install UCN Source Install/Test & Run @ RCNP Design/Fabricate UnInstall Install Shielding Install Design Procure shielding blocks COMMISSION @ TRIUMF Beamline Commissioning UCN Source Commissioning HELIUM LIQUEFIER: He Liquefier System Procure/Install Upgrade He Liquefier Procure Install * Joint RCNP/TRIUMF/Acsion effort
List of Major Milestones 2012 – Dec UCN Source & Spallation Target installation at RCNP. UCN/nEDM prototyping & commissioning begins. 2014 – Apr Kicker (or Kicker Ceramic Beamtube) Installation completed. 2014 – Aug UCN/nEDM RCNP phase completed. Uninstall & transport to TRIUMF. 2014 – Dec Meson Hall Clean-up completed. 2015 – Apr UCN Source & Spallation Target received at TRIUMF. Installation of Target & Source. 2016 – Mar UCN Beamline (BL1U) Installation completed. 2016 – Mar Commission UCN Facility using low intensity beam.