1 / 11

2011

Schedule( 2010-2016 ). 2015. 2016. 2014. 2017. 2011. 2013. 2012. ACTIVITY. J A J O. J A J O. J A J O. J A. J A J O. J A J O. J A J O. MILESTONES. Activities at TRIUMF.

erling
Download Presentation

2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN Timeline & Major Milestones 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block BEAMLINE: Kicker Design & Review Order/Fabricate/Deliver Install Septum Test Install Design Order/Mod Dipole Test Install Order/Fabricate Beamline (incl quads, PS, etc…) Test Install Design Order/Fabricate UCN APPARATUS: Spallation Target * Design/Prototype/Fabricate Install UCN Source Install/Test & Run @ RCNP Design/Fabricate UnInstall Install Shielding Install Design Procure shielding blocks COMMISSION @ TRIUMF Beamline Commissioning UCN Source Commissioning HELIUM LIQUEFIER: He Liquefier System Procure/Install Upgrade He Liquefier Procure Install * Joint RCNP/TRIUMF/Acsion effort

  2. Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN Timeline & Major Milestones 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block BEAMLINE: Kicker Design & Review Order/Fabricate/Deliver Install Install Kicker Ceramic Beamtube Design/Order Fabricate Install Septum Test Install Design Order/Mod Dipole Test Install Order/Fabricate Beamline (incl quads, PS, etc…) Test Install Design Order/Fabricate UCN APPARATUS: Spallation Target * Design/Prototype/Fabricate Install UCN Source Install/Test & Run @ RCNP Design/Fabricate UnInstall Install Shielding Install Design Procure shielding blocks COMMISSION @ TRIUMF Beamline Commissioning UCN Source Commissioning HELIUM LIQUEFIER: He Liquefier System Procure/Install Upgrade He Liquefier Procure Install * Joint RCNP/TRIUMF/Acsion effort

  3. Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN BL1U KICKER 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block KICKER: Kicker Design & Review Order/Fabricate/Deliver Install Install Design & Out for quotes (8) Bid Time & Place Order (29) Vendor final design & Fabr. (324) Acceptance tests & Receive (60) Unpack & Test (19) Ceramic Beamtube & Stands Design/Order Fabricate Install Design & Review (117) Finalize design & Order (71) Fabricate/Assemble (136) Prepare to Install (15)

  4. Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN BL1U SEPTUM 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block SEPTUM: Septum Test Install Design Order/Mod Review & Finalize design (129) Place Order (15) Fabricate Septum Mods (80) Receive & Assemble Septum (110) Map & Test Septum (60) Prepare to Install (40) Vacuum Box & Stand Review & Finalize design (45) Place Order (15) Fabricate (95) Assemble (20) Prepare to Install (10)

  5. Schedule( 2010-2016 ) 2015 2016 2014 2017 2011 2013 2012 ACTIVITY J A J O J A J O J A J O J A J A J O J A J O J A J O MILESTONES Activities at TRIUMF Activities Elsewhere (KEK, RCNP, CERN, Acsion) UCN Timeline & Major Milestones 2015 2016 2014 2017 2011 2013 2012 MESON HALL CLEAN-UP: Remove M11/13; Cleanup M11/13 front-end,septum,1AQ9 Remove BL1B, Core M13 block BEAMLINE: Kicker Design & Review Order/Fabricate/Deliver Install Install Kicker Ceramic Beamtube Design/Order Fabricate Install Septum Test Install Design Order/Mod Dipole Test Install Order/Fabricate Beamline (incl quads, PS, etc…) Test Install Design Order/Fabricate UCN APPARATUS: Spallation Target * Design/Prototype/Fabricate Install UCN Source Install/Test & Run @ RCNP Design/Fabricate UnInstall Install Shielding Install Design Procure shielding blocks COMMISSION @ TRIUMF Beamline Commissioning UCN Source Commissioning HELIUM LIQUEFIER: He Liquefier System Procure/Install Upgrade He Liquefier Procure Install * Joint RCNP/TRIUMF/Acsion effort

  6. List of Major Milestones 2012 – Dec UCN Source & Spallation Target installation at RCNP. UCN/nEDM prototyping & commissioning begins. 2014 – Apr Kicker (or Kicker Ceramic Beamtube) Installation completed. 2014 – Aug UCN/nEDM RCNP phase completed. Uninstall & transport to TRIUMF. 2014 – Dec Meson Hall Clean-up completed. 2015 – Apr UCN Source & Spallation Target received at TRIUMF. Installation of Target & Source. 2016 – Mar UCN Beamline (BL1U) Installation completed. 2016 – Mar Commission UCN Facility using low intensity beam.

  7. Kicker

  8. Septum

  9. Dipole

More Related