APAI/INDOT Longitudinal Joint Technical Sub-Committee

APAI/INDOT Longitudinal Joint Technical Sub-Committee. APAI Winter Conference December 14, 2010 M. Dudley Bonte. History. Need expressed at APAI Technical Meeting 7-28-2009 – Draft Density Specification proposal to INDOT for Consideration

erno
Download Presentation

APAI/INDOT Longitudinal Joint Technical Sub-Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APAI/INDOTLongitudinal Joint Technical Sub-Committee APAI Winter ConferenceDecember 14, 2010 M. Dudley Bonte

  2. History • Need expressed at APAI Technical Meeting • 7-28-2009 – Draft Density Specification proposal to INDOT for Consideration • Need acknowledged by INDOT, but tabled due to more pressing issues (stimulus, RAP, etc.) • 3/08/2010 – Discussion restarted, Task Committee formed

  3. Task Committee • Mike Prather, INDOT • Matt Beeson, INDOT • Jeff James, INDOT • Heather Woods, INDOT • Tom Duncan, FHWA • Brian Crume, APAI • Dudley Bonte, APAI

  4. Direction of Committee • Reviewed NCAT & JTRP reports sent out • Discussed many options for improving Joints • Joint Mastic (best long term performer in studies) • Notch Wedge Joints • Compaction methodology (Roller Techniques) • Density along Joint • Fog seals • Others

  5. Possible Options • Joint Mastic Material • Good LT performance in studies • Plausible short term step • Difficult to measure density • Supply/ without proprietary product • Experimental project in LaPorte District

  6. Possible Options • Density Specification • How to incorporate PWL • More destructive testing (cores on joint) • How to accept and pay? Gmm? Administration?

  7. Possible Options • Fog seal • Reduce permeability • Difficult to measure • Needs further study

  8. Possible Options • COMBINATION OF SOLUTIONS

  9. Special Provision

  10. Special Provision (Approved by Standard Committee) • Joint Adhesive Materials • Applied to intermediate and surface joints • Pay Unit- LFt. • Informational Cores (data gathering) • Acceptance cores- > 12” from Joint • Information Cores- 6” from Joint

  11. Study Plan • Target 6 jobs • Tonnages >15000 ton for Intermediate & > 9000 ton for Surface • Gather & Review data collected • Continue studies of other methods & technologies (e.g. fog seals) • Note: having some difficulty targeting study plan jobs

  12. Discussion / Q & A