An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Northern Tier Interoperable Project Planning Progress Report To The NTIC October 14, 2004

  2. PSSB Role In The NTIC • Consulting and Coordination • Technical Review • Vendor/Contract Assistance • Statutory Requirements • NTIP • Statewide Interoperable Responsibility • Public Relations/Information • Funding

  3. Documents Currently on PSSB Web Site • NTIP Draft Baseline Design • Summary of Collaborative Meeting • Baseline System Design • Minutes of July 22, 2004 Updates To The NTIP Page Will Be Added On A Regular Basis Provides mechanism for non-NTIC members to keep informed.

  4. www.discoveringmontana.com/itsd/techmt/pssb.asp

  5. Documents Available For/Prior To November Meeting • NTIP Estimated Staffing, Cost Estimates and Implementation Schedule • NTIP Recommended Implementation Schedule • NTIP Technical Proposal Outline for RFP • NTIP Draft Technical Proposal

  6. Project Management • The State Proposes Northrop Grumman • 50% Time Sr. Project Manager (Mark Adams) • 50% Jr. Staff • Start date at direction of Consortium • Responsibilities: Assist with – • Project Implementation • Project Coordination (vendor, studies, engineering) • Communication • Technical Review

  7. Draft NTIP Priority Strategy • Wide Area Trunked Voice System • Interconnect work (SWIP and Counties) • Local Area Trunked Voice Systems • Local Area Convention Voice Systems • P25 Data Systems As Required • Dedicated UHF Data System • UHF Paging System

  8. Draft – Proposed Implementation Schedule

  9. Draft – Proposed Implementation Schedule

  10. Estimated Cost Phase OneDRAFT

  11. Questions About Maintenance • Who will conduct the maintenance? • What will the cost implications be for local agencies? • What other options are available?

  12. Proposed Technical Agenda For November Meeting • Detailed Review of Staffing, Cost Estimates and Implementation Strategy • Implementation Recommendations • Draft Technical Section • Review of Maintenance Options