1 / 16

MARYLAND ROUTE 5

MARYLAND ROUTE 5. SAFETY AND TRAFFIC CALMING CONCEPTUAL DESIGN ALTERNATIVES September 14, 2011. PROJECT GROUPED INTO 3 ZONES. NORTH APPROACH AND TRANSITON ZONE. Pedestrian Footbridge (similar to St. John’s Pond). Change to Option 3 background. CORE AREA. SOUTH APPROACH AND

eron
Download Presentation

MARYLAND ROUTE 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MARYLAND ROUTE 5 SAFETY AND TRAFFIC CALMING CONCEPTUAL DESIGN ALTERNATIVES September 14, 2011

  2. PROJECT GROUPED INTO 3 ZONES

  3. NORTH APPROACH AND TRANSITON ZONE

  4. Pedestrian Footbridge (similar to St. John’s Pond)

  5. Change to Option 3 background

  6. CORE AREA

  7. SOUTH APPROACH AND TRANSITION ZONE

More Related