1 / 22

Status quo in Austria

Status quo in Austria. Barbara K é ri • DISC´12 Vukovar December 12, 2012. charts. Full Inland ENC coverage (330.8 km) Publication of IENCs according IECDIS Standard 2.1 – March 2011 Topographical data fully updated – March 2012. IENC updates. Facility information. Bridge cross-sections.

errin
Download Presentation

Status quo in Austria

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status quo in Austria Barbara Kéri • DISC´12 Vukovar December 12, 2012

  2. charts • Full Inland ENC coverage (330.8 km) • Publication of IENCs according IECDIS Standard 2.1 – March 2011 • Topographical data fully updated – March 2012

  3. IENC updates

  4. Facility information

  5. Bridge cross-sections

  6. Paper charts huge effort to produce the paper chart lack of automatism NEWADA duo

  7. DoRIS News • End of the distribution of mobile transponders (31.12.2011) -> • Inland AIS equipment obligation (01.01.2012) • Keep on enhancing the already available services for all users and improve reliability of data • The international data exchange will be one big step further

  8. EU projects • IRIS EU 2  IRIS EU 3 • NEWADA  NEWADA duo

  9. IRIS Europe 3

  10. Overview Motivation: Support Fairway and Traffic Authorities and RIS Providers in enhancing their RIS related services towards the fairway users, and to enable a common quality level of pan-European services Duration: 01/2012 – 12/2014 (3 years) Budget: 10,5 Mio. EUR (aiming for 50% co-funding by TEN-T)

  11. Overview Objectives: • Providing a cooperative implementation environment • Sharing expertise in the day-to-day project work • Solving challenges of European interest in a European environment • Demonstrating / evaluating new RIS technologies and services • Elaborating / implementing quality levels for RIS data exchange • Providing transition support from pilot impl. to regular operation • Enabling countries tackling national priorities by involving logistics

  12. Objectives Improvement of Fairway Information Services • bathymetric IENCs, transient (dynamic) water level models, standardized IENC data exchange, RIS reference data mgmt. Enhanced Traffic and Transport Information Services • virtual reference stations, navigational support systems, low cost fuel saving device, mobile RIS applications, incident mgmt. services

  13. Objectives Quality of Information Services for RIS • Improvement of operation, service level agreements International RIS data exchange • Organisational and legal framework for internat. RIS Data Exchange • Enhancement of interfaces for logistics and authorities • Enhancement of Interconnections with European Services • Interoperability between RIS and Maritime Information Services

  14. Expected Impacts Harmonised implementation of RIS in Europe will make another major step forward • Enhanced services for governmental and logistics users • Geographical extension of RIS • Ensuring minimum service levels Thus IRIS Europe 3 will contribute to an increase of safety, efficiency and environmental friendliness of Inland Navigation

  15. Informing • Customer-oriented information on the current status of the fairway • Different information tools: NtS, RIS websites, information at locks, ECDIS charts etc. • Implementing • Dredging of shallow areasby assigned dredging / river engineering companies • Monitoring of works / performance • Planning • Analysis of surveying results • Development of fairway maintenance plan • Planning of specific inter-ventions optimisation of processes • Monitoring • Continuous monitoring and surveying of the riverbed (bathymetry) • Identification of shallow areas (fords) • Water gauges (hydrology)

  16. KWSM • Customer orientated waterway management • Improving of internal processes and procedures • KWSM managing board out of • via donau (strategic & operational) • OSB

  17. MS12.1 Programm / Projektmgnt. MS12.2 Prozess-management MS01 Unterneh-mensstrategie MS02 Unterneh-menscontrolling MS03 Revision Processmanagement MS12.4 UMS MS12.5 EMS MS12.3 KWSM Management- und Support-prozesse Kernprozesse ….. MS11 Entwicklung und Innovation K01 Infrastruktur-Grundlagen bereitstellen K02 Wasserstraße managen K03 Binnenschifffahrtsinformationsdienste bereitstellen K04 Donauschifffahrt entwickeln K05 Hochwasserschutz durchführen MS08 Öffentlich-keitsarbeit / PR MS04 Recht MS05 Beschaffung MS06 Personal MS07 Rechnungs-wesen K06 Ökologischen Zustand erhalten und verbessern K07 Liegenschaften und Gebäude managen MS10 Backoffice MS09 IT K08 Beratungsleistungen / sonstige Dienstleistungen erbringen MS12 Managementsysteme

  18. aims of processmgmt. • initiate organisational thinking • more user orientated • increase efficiency • identification of gaps and redundancies • supporting knowledge transfer

  19. Hydrographic Surveying Increased use of multi beam Measurement of app. 400 river kilometers per year, 30% – 40% measured with multi beam More frequent measurements in critical sections and developement of a profile database data storage back to 2005 profile distance 25 m (standard 50 m) Data analysis of critical sections

  20. shallow sections

  21. Regelsbrunn

  22. Thank you for your attention! Barbara Kéri Email: barbara.keri@via-donau.org Phone: +435043211635

More Related