CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector)

CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector) CLIC0-002 (photo injector option for CLIC DB injector. CTF3-003. CTF3 future plans, TBL+. Using the TBL line for structure processing,

ervin
Download Presentation

CLIC work packages CTF3-003 (TBL+) CLIC0-001 (CLIC DB injector)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CLIC work packages CTF3-003(TBL+) CLIC0-001(CLIC DB injector) CLIC0-002(photo injector option for CLIC DB injector

  2. CTF3-003

  3. CTF3 future plans, TBL+ Using the TBL line for structure processing, How could it look like, need modified tanks with an input coupler and testing infra structure (supports + waveguide components)

  4. CTF3 future plans, TBL+ Modified tank with input coupler keeping 800 mm length PETS ‘conceptual’

  5. Plans for TBL beyond 2012 What can be done with TBL+ • Develop conditioning scenario for CLICconditioning with beam / use of ON/OFF mechanism of PETS precondition with klystron and then with beam conditioning of PETS • Test bed for PETS development, ON/OFF, new designs, etc • Power production as a function of beam parametersalignment, stability, pulse shape, phase stability, beam loses, failure modes • Continue decelerator beam dynamics studies

  6. CLIC0-001

  7. CLIC0-001

  8. Future plans beyond CTF3 CLIC DB injector Solenoids Thermionic gun Buncher SHB Prebuncher Accelerating cavity 6 MeV Slit 26 MeV 53 MeV Starting to build ‘real’ CLIC hardware with the right frequency and beam parameters Test bed to develop, the 1 GHz power sources for the CLIC drive beam and to study the stability of the very long train

  9. Very rough schedule

  10. CLIC01-002

  11. Photo injector option • Advantages • No satellites or tails, phase coding on the laser side • No or less bunching needed, possibly better emittance • Flexible time structure • Concerns • Cathode lifetime • Challenging laser, peak and average power • Intensity stability • Maintenance and operation