1 / 1

DAQ Latch

PROPOSED E166 TIMING SCHEME. VKB ; June 22, 2004. Source Trigger. TRIG1. DAQ-V1. DAQ. to gate generators for the ADCs, DAQ. TRIG2. DAQ Latch. DAQ-V2. Cosmic Trigger. TRIG3. DAQ-V3. Undulator trigger. 5 ms Latch. TRBR4. TRIG1 – timed with beam TRIG2 – 1 ms after beam

ervin
Download Presentation

DAQ Latch

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROPOSED E166 TIMING SCHEME VKB ; June 22, 2004 Source Trigger TRIG1 DAQ-V1 DAQ to gate generators for the ADCs, DAQ TRIG2 DAQ Latch DAQ-V2 Cosmic Trigger TRIG3 DAQ-V3 Undulator trigger 5 ms Latch TRBR4 TRIG1 – timed with beam TRIG2 – 1 ms after beam TRIG3 – 25 microsec before beam TRBR4 – 1 ms after beam DAQ-V1, DAQ-V2, DAQ-V3 are levels provided by the DAQ The Latches prevent double pulsing TRIG5 Scope trigger 406 TRIG6 Scope trigger 407

More Related