An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Southwood/Fargo Country Club Flood Risk Management Project Neighborhood Meetings July 20, 2011

  2. Southwood/Fargo Country Club • HOW WE GOT HERE • PETITION RECEIVED THIS PAST WINTER FROM NEIGHBORHOOD REQUESTING A LEVEE PROJECT IN REAR YARDS • EMERGENCY LEVEE CONSTRUCTED PRIOR TO THIS PAST SPRING’S FLOOD

  3. Southwood/Fargo Country Club Emergency Levee – As Built BUILT TO AN ELEVATION OF 44-FEET

  4. Southwood/Fargo Country Club – Across Course Levee • ALIGNMENT DESIGNED BY FARGO COUNTRY CLUB’S ARCHITECT • ONLY POSSIBLE ALIGNMENT ACROSS THE COURSE THAT WILL NOT RESULT IN SAFETY ISSUES FOR THE COURSE • PORTION OF SOUTHERN END WITHIN THE FLOODWAY

  5. Southwood/Fargo Country Club – Across the Course Levee • GEOTECHNICAL STUDY COMPLETED • STUDY SHOWED THAT THE FACTOR OF SAFETY FOR THE LONG TERM STABILITY WOULD NOT BE MET • ANALYSIS DID NOT FACTOR IRRIGATION OF DRIVING RANGE INTO IT

  6. Southwood/Fargo Country Club – Permanent Levee Option • CLOSELY FOLLOWS EMERGENCY LEVEE ALIGNMENT • ACTUAL ALIGNMENT WILL BE REVIEWED FURTHER • CENTERED ON PROPERTY LINES FROM 521 TO APPROXIMATELY 909 SOUTHWOOD DRIVE • BUILT TO AN ELEVATION OF 42.5-FEET PLUS 1-FOOT

  7. Southwood/Fargo Country Club – Schedule • JULY 20, 2011 – PUBLIC MEETING • JULY 27, 2011 – BACKYARD WALKTHROUGH • AUGUST 22, 2011 – CALL FOR BIDS • SEPTEMBER 14, 2011 – OPEN BIDS • SEPTEMBER 19, 2011 – AWARD BIDS • OCTOBER 3, 2011 – CONTRACT AWARD, CONSTRUCTION BEGINS SHORTLY AFTER • SPRING 2012 – FINAL COMPLETION • FALL 2012 – PHASE 2 CONSTRUCTION • FUTURE NEIGHBORHOOD MEETINGS WILL BE HELD

  8. Questions?