Cast in Place

Cast in Place. 2 way Basically joists in both directions Flat slabs Supported directly by columns Uses column capitals to distribute load over larger area More reinforcement needed to carry loads to columns F 11-6. Precast concrete. Cast into desired shape at plant and moved to site

eseal
Download Presentation

Cast in Place

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cast in Place • 2 way • Basically joists in both directions • Flat slabs • Supported directly by columns • Uses column capitals to distribute load over larger area • More reinforcement needed to carry loads to columns • F 11-6

  2. Precast concrete • Cast into desired shape at plant and moved to site • Controlled environment -> better finish and quality • All prestressed and pretensioned members are precast • F 11-7, 11-8

  3. Precast concrete • Types • Joists and purlins F 11-7 • Roof and floor panels • Flat 1-4” thick, 15 – 32” wide, 4-10’ long • hollow core 4 – 12” thick, 4-8’ wide, 15 – 50’ long • tee, double tee 4-12’ wide span 12 – 100 feet • channel slabs 2 – 5 ‘ wide, 15-50 ‘ long • F11-8

  4. Precast concrete • Types • Walls • Usually curtain wall construction panels fit between structural components to form wall • But used in tilt up construction • Panels cast horizontally on existing slab and tilted upright • F 11-9

  5. Prestressed Concrete • Initial compression load applied to concrete • Places entire beam in compression • Makes beam stronger since more force is required to induce a tension component • Reduces deflection • F11-10

  6. Prestressed Concrete • 2 ways to do • Pretension – place prestressing material in tension in the form while concrete is poured • Once concrete hardened remove tension • Bond between steel and concrete keeps steel in place • Post tensioning – steel is placed inside a plastic tube during concrete pouring • Upon placement steel is tensioned and the steel is mechanically anchored to the concrete at each end • Load is removed and steel cut flush

  7. Architectural Concrete • Appearance effects • Shape, size, texture, and color • F 11-12 & 11-13

  8. Concrete Construction Practices • Transporting and Hauling • Need to avoid segregation of materials in concrete • Wheelbarrows, buggies, chutes, pumps, conveyors, buckets, trucks • Placing and consolidating • Need to make sure form surfaces and bracing is right before placing concrete

  9. Placing • Forms must be coated in oil to allow removal • If placing concrete on ground – must moisten ground • If pouring on top of cured concrete must place bonding agent between pours • Shotcrete (gunite) – concrete placed pneumatically • Consolidation – removing air voids • vibration

  10. Finishing & Curing • Finishing – bring surface of concrete to its final position and surface texture • Screeding – striking off excess concrete • Floating – smoothes and compacts concrete imbeds aggregates • Troweling – compacts surface F 11-16 • Brooming – surface texture

  11. Curing • To get good concrete must cure properly • Moisture and temperature are key • Moisture – wet straw or burlap, curing compounds • Vacuum dewatering – mat placed on concrete • Vacuum applied to mat – takes out excess water • Lower W/C ratio -> denser mix

  12. Hot weather Concreting • Curing accelerates when concrete temp above 50 – 60 F • How to lower temp • Use cold water in mix • Cool aggregates before mixing • Use Type IV (low heat cement) • Add a retarder • Decrease max time to discharge to 1 hour

  13. Cold weather Concreting • Concrete should not freeze for 1st 24 hours • Min temp for placement is 50F • Use type III (hi early strength) • Use accelerator • Heat water and aggregates before mixing • Use vented heaters to keep concrete warm