1 / 1

Project Title Project #

Project Title Project #. Sponsor Logo. Project Team Principal Investigator name Co-Principal Investigator name (s) Graduate Assistant name (s) Undergraduate Assistant name (s). Project Motivation Gallo Company

etoile
Download Presentation

Project Title Project #

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Title Project # Sponsor Logo Project Team Principal Investigator name Co-Principal Investigator name (s) Graduate Assistant name (s) Undergraduate Assistant name (s) Project Motivation • Gallo Company • The world’s foremost winery in the art and science of grape growing and winemaking • Produces wines in every category, to suit every taste • Gallo’s tank piping network • Age/store • Blend • Bottle • Problems in current pipe routing • Manual tank selection • Reactive scheduling Project Objectives • Model and analyze the current Cellar Tank Piping Network • Research optimal pipe routing path algorithm • Develop customer solution software Project Activities • Current Process Analysis • Problem Formulation • Data Collection and Model Building • Experimental Design • Documentation • Implementation • Validation Research Methodology Network Optimization • Optimization-based piping network analysis • Heuristic-based minimum path analysis with blocking considerations • Analysis of the impact of resource relaxation (i.e., adding pipelines to improve throughput) Model E&J Gallo’s Piping Network • Multi-objective decision making • Minimizes wine damage (routing distance) • Minimizes labor requirement • Maximizes throughput • Resource and piping constraints • Order • Wine assortment • Barrel/tank size • Existing piping network • Proactive scheduling • Order history • Predictive allocation GRAPHIC GRAPHIC GRAPHIC

More Related