1 / 9

Data editing in the Danish CPI

Learn about the 4-step process of editing Danish CPI data, including manual editing, consistency checks, and statistical editing using the HB-method. Understand the parameters and results of the HB-method in data analysis.

Download Presentation

Data editing in the Danish CPI

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data editing in the Danish CPI May 2008

  2. Data editing in the Danish CPI Data editing in the Danish CPI can be divided into 4 overall steps: Manual editing of collected prices Controls for consistency and logical errors Statistical data editing Editing of calculated price indices

  3. Controls for consistency and logical errors

  4. The HB-method Example on distribution of price relatives.

  5. The HB-method Step 1: Step 2: rjM = Median [r1j, r2j, r3j, ... rnj] Step 3:

  6. The HB-method Step 4: , 0  U  1 Step 5: dQ1 = Max {EM – EQ1, AEM} dQ3 = Max {EQ3 – EM, AEM} Step 6: Acceptance interval = {EM – C*dQ1 ; EM + C*dQ3}, Currently, the following values for the parameters are used: U = 0,4 (influence of the price level) A =0,05 (allows a minimum of smaller price changes) C = 5 (broadness of the acceptance interval)

  7. Statistical data editing

  8. Results of the HB-method The data set in February 2008:

  9. Results of the HB-method Errors detected with the HB-method in February 2008:

More Related