1 / 8

Shows where permits have been issued for residential construction.

Shows where permits have been issued for residential construction. Shows growth rate per segment based on where permits have been issued for residential construction. This chart show the relative over or under utilization at each school for the 2008-2009 school year.

eve-moses
Download Presentation

Shows where permits have been issued for residential construction.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Shows where permits have been issued for residential construction.

  2. Shows growth rate per segment based on where permits have been issued for residential construction.

  3. This chart show the relative over or under utilization at each school for the 2008-2009 school year.

  4. This is the population projection for all Pitt County Schools. Capacity and Attendance Boundaries are based on existing conditions. It is important to view this information in two ways, first by attendance boundary (shown here), then by program. The capacities shown here are based on the 100% NCDPI Capacity.

  5. This is the population projection sorted by grade level configuration. Again this shows only the 100% capacity of each school

  6. These construction projects were developed in part due to the Growth Management Committee’s Recommendations. Ayden Middle Add 8 Cr Belvoir Add 4 Cr, Cafeteria, Expand Admin / Media, Renovate MP Chicod Replace old sections, add Gym, New Traffic Pattern Creekside Add 6 Cr D.H. Conley Add Gym, Expand Cafeteria, Renovate Auditorium, New Traffic Pattern Eastern Add 11 Cr, Cafeteria, Expand Admin., Renovations, New Traffic Pattern Farmville Central Add 10 Cr, Expand Cafeteria, New Parking Area G.R. Whitfield Add Connectors, Expand Cafeteria, Lockers, Music Room New Elementary New 742 student Model Elementary Pactolus Sewer Project Sadie Saulter Convert to PK Center Stokes Sewer Project Non Construction: Attendance boundary changes should be expected at many of the schools in order match Student and Core Capacity with their populations. E.B. Aycock, A.G. Cox, and C.M. Eppes

  7. These attendance boundaries will be affected based on the proposed projects.

  8. Although new attendance boundaries have not been created it is anticipated that the schools indicated here may have some adjustments made to their areas.

More Related