An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. http://www.AngelFire.com/RI2/URISeniorDesign3 CaneConsulting@YahooGroups.com

  2. Response to RFP Dated March 9, 1999 Rhode Island DOT Project Reconstruction of Route 138 From Route 2 to Route 108

  3. Personnel Profile – Mike King • Manager: Administrative • Planner: Organizational • Web Page Administrator • HTML • JScript • Management Experience • CADD Manager • Standards development

  4. Design Team Jeff Ley – Transportation, Paul Schofield – Geotech, Ron Hardy – Environmental Andrew Prezioso – Structures, Katherine Manchester – Hydraulics, Mike King - Planner

  5. Project Goals • Facilitate Roadway Sharing • Pedestrians • Bicycles • Enhance Traffic Flow • Improve Safety

  6. Project Theme: Awareness • Historic Districts • Flow Gauging Station • Current flow • Historic extreme flows • Marked flood lines • Landmarks • University Entrances • Dynamic Signs (ITS) <Insert Photo: Historic district sign, flow gauging station, church, dynamic sign>

  7. Challenge Coordinate the growing progressive needs of the University and new housing developments with the historic desires of residents

  8. Personnel Profile – Katherine Manchester • Assistant manager • Hydraulics engineer • URI Cooperative Extension Water Quality Program • RIDOT Internship • Undergraduate research assistant

  9. Presentation Overview • Bottom Up Approach • Geotechnics: Foundation of project • Structural: Supporting bodies • Transportation: Roadway • Environmental: Water quality • Hydraulics: Runoff / precipitation management

  10. Personnel Profile – Paul Schofield • Geotechnical Engineer • RIDOT Internship • Geotechnical Engineering coursework • National Society of Collegiate Scholars

  11. Soil Analysis • Borings • Type of Soil • Bearing Capacity • Drainage Adequacy <Insert Photo: Soil testing>

  12. Foundation Options • Shallow Foundations • Rectangular Footings • Cantilever Footings • Floating Foundation • Deep Foundations • Piles • Drilled Piers <Insert Photo: Foundation Types>

  13. Retaining Walls • Riverbanks • Embankments • Types • Gravity • Cantilever • Backfill <Insert Photo: Retaining Wall>

  14. Geosynthetics • Erosion Control • Soil Reinforcement • Drainage Control • Suitable Types <Insert Photo: Geosynthetics>

  15. Personnel Profile – Andrew Prezioso • Structural Engineer • RIDOT Internship • Site Engineering, Inc. • Structures Coursework • Structural Analysis • Foundation Engineering • Analysis of Steel Structures • Concrete Design • Future Plans: Grad School

  16. Structural Objectives • Minor Objective: • Widening of the following culverts • White Horn Brook • Chipuxet River • Chickasheen Brook • Reconstruction of Kingstown Station Railroad Bridge Insert Picture of kingstown RR bridge.

  17. Structural Objectives (Cont.) • Primary Objective • Freestanding pedestrian/bike bridge crossing Amtrak • Emergency vehicle capability • Safe bicycling environment • Low maintenance costs

  18. Location • Parallel with the current Kingstown Railroad Bridge. • Northeast • Southwest pictures pictures

  19. Bridge Alternatives • Steel • Wood • Steel/Wood

  20. Bridge Alternatives (Cont.) • Pre-stressed Concrete • Cast-in-Place Concrete

  21. Design Considerations • Span • 2 Span or 3 Span • Width • Possible Link to South County Bike Path (Ongoing Study VHB/RIDOT) • Possible link to West Kingston Park. Insert Picture of West Kingston Park and picture of south county bike path (William O’niel)

  22. Preliminary Cost Estimate • Current Market Prices • Concrete (cy): $600.00 • Steel Grade 50W (pound): $1.75 • New England Bulb Tee (NEBT): $310-340 LF • A Concrete Bridge Deck Approx 150 ft x 14 ft x 8 in. = $31,000

  23. Personnel Profile – Jeff Ley • Transportation Engineer • Highway Engineering Coursework • Undergraduate Research

  24. Segment Safety Issues • Larger Shoulder • Stopping Sight Distance • Left Turn Lanes • Lower College Road • Fraternity Circle • Keaney Gym <Insert Photo: Shoulder, Turning Lands>

  25. Roadway Sharing Issues • Shared Shoulder • Sidewalk Issues • Repair • Replace • Construct • Crossing Options • Pedestrian Bridge • Signalized Crosswalks <Insert Photo: Deteriorating Sidewalk>

  26. Traffic Calming Issues • Roundabouts • Route 2 • Route 110 • Route 108 • Design Speed <Insert Photo: Roundabout, Speed Limit Sign>

  27. Other Considerations • Use of RAP (Recycled Asphalt Pavement) • Coordination of Historic Districts • Right-of-way acquisition <Insert Photo: RAP Operation>

  28. Personnel Profile – Ron Hardy • Environmental Engineer • DOT Internship • Environmental Engineering Coursework

  29. Investigations • Common Contaminants • Retention Times • Climate • Topography http://cfpub.epa.gov/npdes/stormwater/

  30. Treatments • Vortechnics • Vegetative Swales • Swirl Concentrators

  31. Other Considerations • Mobil Station Gas Spill • Wetland Delineation • Permit Acquisition

  32. Hydrology • Drainage Areas • Direct Runoff • Indirect Runoff • Design Storm • Runoff Quantity <Insert Photo>

  33. System Evaluation Investigations • Increased Curbing • Existing Drains • Existing Culverts Designs • Drain Locations • System Capacity • Culvert Capacity

  34. Ultimate Design Goals • Respect the needs of the community • Create and maintain historic perspective • Meet growing needs of the University • Help users recognize roadway features • Maintain safe, efficient traffic flow • Enhance bicycle / pedestrian accessibility

  35. The Ability to Succeed