1 / 20

Colonel Scot C. Miller Project Manager , Defense Communications and Army Switched Systems

P. Building the Global Information Infrastructure: Progress and Challenges . Colonel Scot C. Miller Project Manager , Defense Communications and Army Switched Systems. Installation Information Infrastructure Modernization Program (I3MP).

eyad
Download Presentation

Colonel Scot C. Miller Project Manager , Defense Communications and Army Switched Systems

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P Building the Global Information Infrastructure: Progress and Challenges Colonel Scot C. Miller Project Manager, Defense Communications and Army Switched Systems

  2. Installation Information InfrastructureModernization Program (I3MP) Acquire and field the Army’s installation level telecommunications information infrastructure (voice & data switches/cable/long haul gateway), including the hardware and software required for Enterprise Solutions. Provide base level information infrastructure at Army posts, camps, and stations worldwide via the Installation Information Infrastructure Modernization Program (I3MP). Provide the LandWarNet backbone in support of Reachback, Global Information Grid (GIG), GIG Bandwidth Expansion (GIG-BE), and NetCentricity. Corps HQ Div HQ

  3. APEO Mr. Gary Wetterhall Ft. Belvoir, VA 703.806.3775 Acquisition Management Directorate Ms. Carolyn Sprague Ft. Belvoir, VA 703.806.3244 Business Management Directorate Mr. William Blanding Ft. Belvoir, VA 703.806.4238 Chief Technical Office Mr. Eduardo Velez Ft. Belvoir, VA 703.806.4195 Operations & Mission Support Directorate Mr. Reginald Bagby Ft. Belvoir, VA 703.806.3888 PEO EIS Org Chart PEO Mr. Kevin Carroll 703.806.4235 Ms. Catherine Doolos 703.806.3336 Deputy PEO COL Tom Hogan 703.806.4200 Deputy PEO Mr. Lee Harvey 703.806.4595 Program Manager, SALE (Acting) Deputy PEO PM TIS Mr. Robert Morris Springfield, VA 703.752.0755 PM BIOMETRICS COL Steve Bristow Ft. Belvoir, VA 703.806.0538 PM DCASS COL Scot Miller Ft. Monmouth, NJ 732.532.7910 PM LIS (Acting) Mr. Nicholas Castrinos Ft. Lee, VA 804.734.7665 PM LMP (Acting) COL David Coker Ft. Monmouth, NJ 732.427.1062 PM DCATS COL Gale Harrington Ft. Monmouth, NJ 732.532.7920 PD Acq. Domain Mr. Joseph Klumpp (Acting) Ft. Belvoir, VA 703.806.0574 PD PR Mr. Joseph Klumpp Ft. Belvoir, VA 703.806.0574 PM SPS COL Quentin Peach Fairfax, VA 703.460.1490 PM DCS-SWA PM DCS-C PM DCS-P PM DCS-E PM DMS-Army PD TAO APM IES PM AHRS PD DIMHRS PM DWTS PD SCS APM LMR APM PI APM TSI-E APM TSI-P APM WC PD FMS Dr. David Powers Lorton, VA 703.373.1025 PD ALTESS PM FBS Acq. Integration Ofc. PM JAIT PM MTS PD ALIS APM JCALS PM PLM+ LTC Gary Hallinan Ft. Belvoir, VA 703.806-4108 PM ELS LTC Robert Zoppa Ft. Lee, VA 804.734.6646 PD GFEBS Ms. Chérie Smith Arlington, VA 703.797.8770 PD ASCP Ms. Michelina Laforgia Ft. Monmouth, NJ 732.427.6595 PD AKO COL James Barrineau Ft. Belvoir, VA 703.704.1784 PD ITS Mr. Hari Bezwada Arlington, VA 703.614.9979 PD IMS-A / MEPCOM Ms. Guri Glass Ft. Belvoir, VA 703.806.0500 PM MC4 LTC Edward Clayson Ft. Detrick, MD 301.619.7858 PD RCAS Ms. Belva BelfourNixon Arlington, VA 703.601.2656 PM DLS LTC Robert Bean Newport News, VA 757.369.2900 PEO Liaison Mr. Jim Washburn 703.604.7134 Mr. Mark Fornaro 703.604.7125 Mr. Bob Farmer 703.604.7114 Mr. Dennis Birchall 703.604.7023

  4. Project Manager, Defense Communications and Army Switched Systems (DCASS) PM - COL Scot C. Miller DPM - Ms. Dolores Mancini (732) 532-7910 Defense Message System-Army (DMS-A) Acting PDM Mr. C. Cicalese (732) 532-7913 Acting DPDM Mr. W. Stapleton Defense Communications Systems – Europe (DCS-E) LTC C. Wells 314-380-5960 DPDM Mr. R. Reitmeyer Defense Communications Systems – Southwest Asia (DCS-SWA) LTC C. Wells (732) 532-7912 Defense Communications Systems – Pacific (DCS-P) PDM LTC J. Garcia (808) 656-2060 DPDM Mr. P. Barnette Technology Applications Office (TAO) Dir Mr. J. Chwalek (301) 619-6300 Dep Mr. J. Swart I3MP Enterprise Systems (IES) APM Mr. H. Kump (732) 532-7963 Mr. J. Ortega - Operations Ms. J. Tracy - Technical Defense Communications Systems – CONUS (DCS-C) PDM LTC E. Swanson (732) 532-7911 DPDM Mr. C. Powderly Technical Management Division (TMD) Chief Mr. H. Kump (732) 532-7963 PM DCASS Organization Business Management Division (BMD) Chief Mr. J. Dempsey (732) 427-6585

  5. I3MP Organizational Relationships • CIO / G-6 (AONS) • Policy for Enterprise Systems • Architecture Oversight • I3MP Master Plan • Quarterly IPR BG Foley • NETCOM • O&M Army’s Enterprise-Level Infostructure • Exercise Technical Control & Config Mgmt • Army’s Information Assurance Manager • PEO EIS / PM DCASS • Material Developer • Program Management • System Design & Integration

  6. I3MP Products/Capabilities Theater Centric Capabilities Based State-of-the-Shelf Technology Converged Solutions Enterprise Solutions Support for Modularity Improved Quality of Service Outside Cable Plant Voice Networks Data Networks GIG and GIG Bandwidth Expansion

  7. BCT HQ • C4I • E-MAIL • ASSET VIS • VTC DCO • VOICE SWITCH • MCN • TLA • EMAIL BN HQ DISN DSN PSTN • DIMHRS • C4I • E-MAIL Tier 2 MAINTENANCE • GCSS DIGITAL FAC • IETM DISCOM/ DOL/ DRM • TOTL ASSET VIS DIST LEARN • TELE CONF • ELEC COMMERCE • • PAPERLESS SIMULATION • MOTOR POOL CONTRACTING • TOTL ASSET VIS • GCSS • TOTL ASSET VIS • FIXED TACTICAL INTERNET HOSPITAL • CHCS II DIGITAL RANGES I3MP Architecture FIBER OPTIC CABLE “DATA PIPELINE” How to get there? O’CONNELL 4 WETZEL GATE 2 “Fort Warfighter” ELLIS Fiber Cable WiFi/WiMax Microwave Freespace Optics Relocatable Building POST HQ CHILES MCGRATH • GCCS / DMS PRUSSMAN • VTC / COLL PLAN • SPLIT BASE OPS SPECKER BARKELEY KHE SANH Airfield/Deployment Assembly Area GIG Operate and train as deployed! Permanent Command Facilities

  8. Technology Transition 10+ Gbps Network Wireless Transport Options IPv6 Voice / Video / Data Convergence Secure Wireless LAN DWDM and/or MPLS Network Access Control

  9. Focus – Southwest Asia Defense Communications Systems – Southwest Asia

  10. Support to the Theater Warfighter To design, procure, test, and field high-capacity data, imagery, and voice network capabilities to fully support the deployed Warfighter in Southwest Asia. PM DCS-SWA Focus Campus / Local Area Networks (CAN/LAN) Voice & Data services on the installation, via communications networks extending from C4 Facility to End User Buildings (EUB) [Outside Plant (OSP)], and within EUBs [Inside Plant (ISP)]

  11. Kuwait I3MP Projects

  12. Kuwait I3MP Projects • Khabari Crossing Project Complete – 31 Dec 06 • Provide OSP, ISP, Data (NIPR, SIPR) & Voice services to support 200 users at critical new border crossing facility • Camp Arifjan • Providing OSP, ISP, Data (NIPR, SIPR) & Voice services to support up to 10,000 users as base expands. • Eventually - Extend NIPR/DSN to the Arifjan AMC Warehouses, NOC, and Administration Facilities – Complete 2007 • Camp Buehring • Provide OSP, ISP, Data (NIPR, SIPR) & Voice services to support 5000 users (Oct 2007)

  13. Iraq I3MP Projects

  14. Iraq I3MP Projects • COB Speicher IOC 31 Dec 06 • All ADNs active, passing test traffic • Data backbone loop complete (48 strands) • ~48 EUBs connected • Working toward FOC now • COB Anaconda IOC May 07 • EUB remediation, VSS for EUBs, OSP distribution remediation • SL-100 commissioning and cutover • ADN remediation and move of ADN 5550 • Potential remediation of 77 additional EUBs • COB Al Asad IOC April 07 • Installation of containerized CS 1000M voice switch and 6 ADNs • CS 1000M MILAIR shipment expected Feb 07

  15. Afghanistan I3MP Projects

  16. Afghanistan I3MP Projects • Bagram Airfield:- Fiber Ring • Cable manhole duct system and data network backbone • Soldier labor implementation - JOC Compound - SL100 Nortel Voice switch - Nortel voice switch upgrade • Install Nortel 81C remote • Kabul – Camp Phoenix • OSP / ISP + switch upgrade • Kandahar • ADN Installations • EUB Connectivity to OSP backbone • E&I contract extension in progress

  17. Unwanted Guest(s)

  18. CHALLENGES • The True Definition of a VUCA Environment • Unstable and changing requirements environment poses unique challenges when developing systems or building infrastructure for combat • High cost of doing business on the battlefield • Need to satisfy multiple stakeholders • Long-term, strategic architecture for the integration of digital combat systems in warfighting theater - WIP • Dynamics of Warfighting Theater lends itself to “Good Enough” standards

  19. Big Finish PM DCASS is in position to: • Continue to Introduce New Technologies for the Warfighter, With Utility for Multiple Theaters, Including SWA: • Wireless • EOIP • Support Overall Cost Reductions for Army Customers • APCs • Enterprise Services • Continue Outstanding Support to Special Programs Customers • Implement Modularity in a BRAC Environment • Support Commercialization of Communications in SWA • Support Army Vision of Migrating to a Converged Network

More Related