Stabilisation day #6 Brief n ews from CLIC module WG

Stabilisation day #6 Brief n ews from CLIC module WG. G. Riddone on behalf of the CMWG, 09.06.2009. Content. Recall of baseline design for CDR Design evolutions (from version 2 to version 4) Future work. Module design baseline.

eytan
Download Presentation

Stabilisation day #6 Brief n ews from CLIC module WG

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stabilisation day #6 Brief news from CLIC module WG G. Riddone on behalf of the CMWG, 09.06.2009

  2. Content Recall of baseline design for CDR Design evolutions (from version 2 to version 4) Future work

  3. Module design baseline Accelerating structure: CLIC G (100 mV/m, L = 230 mm, aperture ~ 5 mm) PETS: CLIC note 764 (6.5 MV/m, L=310 mm, aperture 23 mm) 1 PETS powering 2 accelerating structures Beam interaxis: 650 mm  same height for the two beams Accelerating structures and PETS + DB Q on girders (same girders based on MB girder design) Girder end supports  cradles mechanically attached to a girder and linked by rods to the adjacent one: snake-system adopted(DB: 100 A, MB: minimization of wakefields, validation at 30 GHz in CTF2) Separate girders for main and drive beam  possibility to align DB quadrupole separate from accelerating structures Separate support for MB Q and its BPM MB Q and BPM rigidly mechanically connected Common actuators/devices for stabilization and beam-based feedback systems

  4. Module type 1 2 DB Q + BPMs 3 PETS 6 AS MB Q + BPM

  5. Module type 1 – version 2 All 3D models made by A. Samoshkin

  6. Module type 1 views – version 2

  7. CLIC two-beam module - version 2 CTF2 Continuity between girders All MB girders have the same length MB Q support passes over the MB girder MB Q beam pipe and AS beam pipe are coupled via bellows

  8. CLIC two-beam module - version 4 No full continuity between MB girders (increasing of align. cost) MB girder length changes as function of module type No girder underneath MB Q Beam height lowered MBQ support simplified MB Q beam pipe and AS beam pipe are coupled via bellows

  9. Future work • At present the beam height is imposed by the drive beam: • Height of the girder (same as for MB girder) • DBQ support • DBQ dimensions ACTIONS • Calculation for the DB girder has been launched to optimise its size and with the aim of lowering its height • Confirmation of DB Q dimensions and support (CERN-Crockford institute)