110 likes | 298 Views
Major Initiatives Update. Marine Corps Logistics Command. Marine Corps Operation Enduring Freedom Reset. Marine Corps Operation Enduring Freedom (OEF) Reset. Purpose and Agenda. Purpose Provide an overview of MCLC’s Operation Enduring Freedom (OEF) Reset support and current operations.
E N D
Major Initiatives Update Marine Corps Logistics Command Marine Corps Operation Enduring Freedom Reset Marine Corps Operation Enduring Freedom (OEF) Reset
Purpose and Agenda • Purpose • Provide an overview of MCLC’s Operation Enduring Freedom (OEF) Reset support and current operations. • Agenda • Institutional Guidance • Reset Definition • Reset Support • Current Status
Institutional Guidance FOR OFFICIAL USE ONLY Ground Equipment Reset Playbook OEF Reset actions informed by: Drawdown, Retrograde, and Redeployment of Operation Iraqi Freedom Forces: Logistics Throughput and Capacity Drawdown 17 February 2010 March 2, 2012 Version 20120302
Reset Defined • Actions taken to restore unit equipment to a desired level of combat capability commensurate with the unit's future mission. • There are three components to reset: • Repair – The restoration of an item to serviceable condition through correction of a specific failure or unserviceable condition. • Recapitalization – Extending the equipment's useful life by returning it to near zero mile/zero hour condition with either original performance specifications or upgraded performance specifications. • Replacement – Acquisition of new equipment to replace battle losses, washouts, obsolete equipment, and equipment deployed and left in theater but needed for critical missions. • Operation Enduring Freedom Ground Equipment Reset Strategy – 1 Jan 12
reset snap shot Reset Snap Shot 1 Aug 2011 to 23 Apr 2013 RETROGRADE/ REDEPLOYMENT RESET Transit Working Complete Shipped I MEF 2,857 MST 6,063 R4OG 12,037 II MEF 3,686 IN TRANSIT 4,851 MCLC 15,794 III MEF 1,660 MCLC (FWD) 29,540 ISSUED STORES 311 DLA-DS 4,412 RFI 1,706 26,269 (63%) *41,577 4,851 (12%) 10,220 (25%) + + = *Class VII, SAC3 Principle End Items
Reset Snap Shot: Returned to MCLC Working LOGCOM processing MST 6,063 MCLC 15,794 DLA-DS 4,412 RECEIVED BARSTOW 1,743 RECEIVED ALBANY 16,698 DMISA/COMM 511 26,269 (63%) Sent direct to alternate SOR from In Theater = + + + RECEIVED 18,441 RFI 1,266 ISSUED 311 DLA-DS 1,070 WORKING 15,794 Other actions 10,134 In Progress FLM 238 In Progress Depot 5,422 Issued from “In Stores” IAW CMC Sourcing Priorities Pend PM’s identification of Reset Strategy Pend LTI for determination of condition code Awaiting SL3
Reset Snap Shot: Depot Maintenance MEF SUPPORT TEAM WORKING 15,794 In Progress Depot 5,422 7
Reset Snap Shot: MEF Support Teams OEF MAGTF / R4OG MCLC (FWD) Complete I MEF 2,857 RECEIVED: 3,903 5,028 3,357 1,585 1,241 233 II MEF 3,686 III MEF 1,660 ISSUED STORES 311 RFI 1,706 TOTAL RECEIVED: 5,488 6,269 3,590 9,966 (24%)
Depot/Reset Liability FY12 – FY16 Total Depot reset liability: $1.2B (Note: Does not include OEF Sustainment)