1 / 3

Meter Development

Meter Development. Redesigned meters to LBL safety requirements Approved by EH&S Electrical Safety on 9 April 2010 Production of first 150 meters complete 30 April 2010 Burn in, calibration, variability testing underway 750 meters scheduled for delivery in June. Example Metered Data.

fadhila
Download Presentation

Meter Development

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Meter Development • Redesigned meters to LBL safety requirements • Approved by EH&S Electrical Safety on 9 April 2010 • Production of first 150 meters complete 30 April 2010 • Burn in, calibration, variability testing underway • 750 meters scheduled for delivery in June

  2. Example Metered Data Laptop 2 Laptop 1

  3. Example Metered Data • Sample taken every 15s • Stored to database at LBNL • Analysis tools: • Automated power level identification • Fraction of time/energy in mode • Total energy consumption • Histograms • Cumulative distributions Charging after battery powered use Idle state in new laptop

More Related