1 / 34

Natural Disasters: Impact Assessment for Sustainable Recovery STRATEGIC PLANNING AND ASSESSMENT

Natural Disasters: Impact Assessment for Sustainable Recovery STRATEGIC PLANNING AND ASSESSMENT Professor Bryan Jenkins Waterways Centre for Freshwater Management. ASSESSMENT APPROACHES. Resilience assessment for natural disasters - flood management for Waimakariri River

falala
Download Presentation

Natural Disasters: Impact Assessment for Sustainable Recovery STRATEGIC PLANNING AND ASSESSMENT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Natural Disasters: Impact Assessment for Sustainable Recovery STRATEGICPLANNING AND ASSESSMENT Professor Bryan Jenkins Waterways Centre for Freshwater Management

  2. ASSESSMENT APPROACHES • Resilience assessment for natural disasters • - flood management for Waimakariri River • Strategic assessment for development strategy • - Greater Christchurch Urban Development Strategy • Natural hazard assessment • - Liquefaction risk in Christchurch • Recovery strategy • - Avon Otakaro River Park

  3. MANAGING NATURAL HAZARDS • Traditional Approach • - design for protection for a specified return event • 2004 Manawatu Floods • - Palmerston North protected • - rural areas flooded when stopbank failed • - flooded areas remain flooded: flood waters unable to get back to river

  4. Manawatu - Fitzroy Bend

  5. Oroua - Kaimatarau Rd

  6. Waimakariri in Christchurch, 1868

  7. CHRISTCHURCH FLOOD RISK

  8. RISK MANAGEMENT APPROACH TO FLOODING • Design flow for stopbank capacity • 1 in 500 year flood flow: 4,730 cumecs • Risk for flood flows greater than design flow • 1 in 10,000 year flood: 6,500 cumecs • Risk of breakouts from stopbank failure below design flow • 70% design flow: 3,300 cumecs • Risk in 30 year period • 50% chance of stopbank threatened • 10% chance of urban area flooding

  9. RESILIENCE APPROACH • Secondary stopbank designed for 1 in 10,000 year flood: 6,500 cumecs • Primary stopbankfailure: floodwaters retained between primary and secondary banks and returned to the river • Secondary stopbank failure: only excess volume released and time available for emergency response

  10. SECONDARY STOPBANK

  11. CONTAINMENT AND RETURN OF BREAKOUT FLOW

  12. STRATEGIC ASSESSMENT FOR GREATER CHRISTCHURCH URBAN DEVELOPMENT STRATEGY • Non Statutory Collaborative Approach • Development Opportunities and Constraints • Consideration of Development Options • Assessed against Four Well-Beings • Key Indicators for Comparison • Community Feedback • Final Strategy • Statutory Backing through Regional Policy Statement

  13. Limits on Development Airport Noise and Aquifer Protection Zones • Other environmental “layers” taken into account, e.g.: • Port Hills • Floodplains • Ecological systems • Strategic Infrastructure

  14. Canterbury Regional Policy Statement Plan Change 1

  15. RPS ENDORSED UNDER SPECIAL LEGISLATION • Planning framework has to provide for relocation and rebuild following red zoning • RPS process needs to be sped up and modified to accommodate earthquake events • More intensive use of land within existing urban areas and greenfields development • RPS covers: areas for urban development; residential densities; provisions for business; sequencing of developments; enabling integrated management

  16. Canterbury Regional Policy Statement Approved Map

  17. NATURE OF LIQUEFACTION RISK • Ground shaking of unconsolidated silts and sands • Soil mass compacts and decreases in volume • This causes water to be ejected: sand boils • Ground surface may subside: differential settlement puts foundations at risk • Lateral spread on sloping surfaces near rivers streams and coastal areas

  18. FACTORS USED TO ASSESS LIQUEFACTION POTENTIAL • Strength of ground shaking • Duration of shaking • Soil properties (grain size and density) • Depth to water table • Confining pressures

  19. ASSESSMENT OF LIQUEFACTION GROUND DAMAGE • Ground subsidence • Slope failure of sloping ground • Lateral spread of natural banks and embankments

  20. HOUSE CRACKING DUE TO LATERAL SPREAD FROM LIQUEFACTIONSept 4 2010earthquake

  21. MITIGATION OF LIQUEFACTION RISK • Avoidance of areas with liquefaction potential • Methods of mitigation - stabilising ground - foundation design - strengthening structures • Examples of mitigation - vibro compaction of soil: W/W treatment plant, • Pegasus subdivision - piles through liquefiable layers: Opawa road bridge - stone columns: Paul Kelly stand

  22. LAND DAMAGE IN SUBURBS ALONG AVON RIVER (as at 5 Nov 2010)

  23. PHYSICAL IMPACTS OF EARTHQUAKES • Building damage • Liquefaction • Ground settlement • Sewage discharge • Hydrology changes

  24. ELEVATION CHANGE IN ESTUARY

  25. EFFLUENT EFFECTS ON ESTUARY Water nitrogen (blue) Sea lettuce chlorophyll (green) Diversion Quake I Quake II

  26. LAND ZONED RED

  27. AVON OTAKARO RIVER PARK • Ecological and recreational reserve • Memorial to those who lost lives • Retention of garden elements of demolished homes • Pedestrian and cycle paths • Land and water based recreational facilities • Tangatawhenua cultural enhancement • Stormwater wetland treatment and sewage overflow temporary storage

  28. CONCLUDINGCOMMENTS • Use of Resilience Assessment - design to prevent failure not a frequency standard • Use of Strategic Assessment - valuable in guiding expected development; invaluable in unexpected events • Use of natural hazard assessment - avoidance or mitigation of risk • Recovery Strategy - opportunity to address old as well as new issues

More Related