American Electric Power Company. Transmission Formula Rate AEP East Companies Annual Formula Rate Update June 2012. TRUE-UP PROCESS. Annual update for the Rate Year beginning July 1, 2012 through June 30, 2013 True-up
E N D
American Electric Power Company Transmission Formula Rate AEP East Companies Annual Formula Rate Update June 2012
TRUE-UP PROCESS • Annual update for the Rate Year beginning July 1, 2012 through June 30, 2013 • True-up • Rates effective July 1, 2010 (billed January – June 2011) -- $65.88/MW Day • Rates effective July 1, 2011 (billed July – December 2011) -- $74.89/MW Day • Trued-up to Actual 2011 Cost Data with Average ending Ratebase Balances (2010-2011) -- $70.69/MW Day
Regulatory Changes • July 2011 FERC issued an order approving the internal corporate reorganization consummated on December 31, 2011 under which Columbus Southern Power Company (“CSP”) merged into Ohio Power Company (“Reorganization Transaction”). • March 2012 AEP submitted for filing amendments to Attachments H-14A, H-14B of the PJM Interconnection, L.L.C. (“PJM”) Open Access Transmission Tariff (“PJM Tariff”) to incorporate proposed revisions to make changes necessitated by the internal corporate reorganization.
Annual Update 2012 http://www.aep.com/about/codeofconduct/ OASIS/TariffFilings/ • Annual Update - 2012 • Notice of Annual Filing (PDF) • Annual Update Customer Meeting Notice (DOC) • Formula Rate Update AEP Operating Companies Summary (DOC) • PJM ATRR Formula Rate Summary (XLS) • Appalachian Power Company (XLS) • Indiana Michigan Power Company (XLS) • Kentucky Power Company (XLS) • Kingsport Power Company (XLS) • Ohio Power Company (XLS) • Wheeling Power Company (XLS) • NITS Attach C True-Up (XLS) • RTEP Attach C True-Up (XLS) • Schedule 1A Attach C True-Up (XLS) • AEP Actuarial Report Non-UMWA YE 2011 (PDF) • AEP Actuarial Report UMWA YE 2011 (PDF) • ADIT Detail Historical (XLS) Docket No. ER08-1329-000, OATT Formula Rate
Primary Drivers Decreasing Rate • Projected 2011 investment within 2% of actual 2011 capital spend • 4% increase in the East Zone Network Service Peak Load • Decrease in O&M Expense for 2011
Revenue Requirement (including revenue credits)used to calculate the Existing Zonal ATRR for PJM OATT
Gross Plant Investment – 2011 Projected vs. 2011 Actual Average Balance Gross Plant Investment Includes allocated general and intangible plant investment.
O&M Expense Comparison 2011 Projected Cost of Service includes 2010 actual expense 2011 True-up Cost of Service includes 2011 actual expense.
Revenue Requirement For PJM Socialized ‘Schedule 12’ Investment
Summary Comparison 2011 Projected – 2011 True-up
Summary Comparison 2011 Projected – 2011 True-up (cont.)
Summary Comparison 2011 Projected – 2011 True-up (cont.)