1 / 6

D. Attié , P. Colas, M. Dixit, M. Riallot, Y.-H. Shin

ILC-TPC panel + T2K electronics. D. Attié , P. Colas, M. Dixit, M. Riallot, Y.-H. Shin. RD51 Mini Week - CERN. Micromegas + T2K electronics in LP1 TPC. Data taking diagram. Goliath magnet. Beam trigger. V drift =1 kV. CAEN 471A (NIM). SHV cables. V mesh = 380 V. T2K electronics

fauve
Download Presentation

D. Attié , P. Colas, M. Dixit, M. Riallot, Y.-H. Shin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ILC-TPC panel + T2K electronics D. Attié, P. Colas, M. Dixit, M. Riallot, Y.-H. Shin RD51 Mini Week - CERN Astrophysics Detector Workshop – Nice – November 18th, 2008

  2. Micromegas + T2K electronics in LP1 TPC RD51 Mini Week – CERN – September 24, 2009

  3. Data taking diagram Goliath magnet Beam trigger Vdrift =1 kV CAEN 471A (NIM) SHV cables Vmesh = 380 V T2K electronics 1728 channels Back-end electronic (ML405) Optical fibre Lemo LV-TTL TCP/IP via ethenet LV (+5 V) PC T2K DAQ on Linux T2K gas (5L/h) 500 Go Standard PC Power supply HDD Hall Control room RD51 Mini Week – CERN – September 24, 2009

  4. Detector description 1/2 1726 pads Micromegas resistive bulk 17 cm 23 cm 24 rows x 72 columns; <pad size> ~ 3.2x7 mm2 RD51 Mini Week – CERN – September 24, 2009

  5. Detector description 2/2 • Total weight: ~20 kg • Radiation length: 40% (2×1.8 cm of aluminium) B field Top 27 cm 40 cm Bottom 35cm 11 cm RD51 Mini Week – CERN – September 24, 2009

  6. Requests and status of the beam tests • Magnet: most of the time • Particles: 2-3 days muons , if possible. 50-100 Hz sufficient (limited by DAQ rate). The rest can be hadrons, from low to very high rates • Precision tracking and behaviour of the resistive coverlay. • We need to scan the detector (move frequently) for homogeneity studies.Most data to be taken with T2K gas (ArCF4Iso) but would be nice if a part can be Ar+5%Iso • Need to install the box on a small lift table and secure it • Optical fiber, SHV, gas cable already installed • We also plan to contribute to the RESIST test organized by S. Aune and F. Kunne next to our setup in the magnet RD51 Mini Week – CERN – September 24, 2009

More Related