1 / 5

Introduction

Introduction. Mark Tobin LPHE – EPFL. RICH SciFi Tracker TORCH UT VELO. Week 41: 06/10 – 12/10 Week 43: 20/10 – 26/10 Week 44: 27/10 – 02/11 Week 48: 24/11 – 30/11. LHCb also has beam time at PS. H8 Beam Line. Beam characteristics: Attenuated primary or high-energy hadron (e±) beam

faxon
Download Presentation

Introduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction Mark Tobin LPHE – EPFL SciFi Tracker Test-beam Meeting

  2. RICH SciFi Tracker TORCH UT VELO Week 41: 06/10 – 12/10 Week 43: 20/10 – 26/10 Week 44: 27/10 – 02/11 Week 48: 24/11 – 30/11 LHCb also has beam time at PS SciFi Tracker Test-beam Meeting

  3. H8 Beam Line Beam characteristics: • Attenuated primary or high-energy hadron (e±) beam • Described in EDMS Document No.1362712. • http://sba.web.cern.ch/sba/BeamsAndAreas/resultbeam.asp?beamline=H8 • Momentum range: • Primary beam: 400 (450) GeV/c. • Secondary beam: 10 – 400 GeV/c. • Secondary target: • Tertiary beam. • Pions, electrons, muons. • Maximum intensity: 2*108 particles / spill. • One spill every 14 – 48 seconds. Typically settings: • 180 GeV/c pions/protons (+ ~ 1% muons). • 106 – 107 particles / spill. • ~ 10 seconds / spill. SciFi Tracker Test-beam Meeting

  4. Infrastructure In area: • Dry air, electricity, network. • Network outlets connect to general CERN network. • Beam instrumentation. • Scintillators and wire scanners. • PC in control room. • We have to provide everything else! In Barrack (HNA-443): • Wifi + network outlets. • Beam control PC. • We have to provide PCs, screens, etc. Safety: • Building (include control room) is supervised area. • Need dosimeter, safety shoes and helmet. SciFi Tracker Test-beam Meeting

  5. Today’s discussion • Goal of the test beam. • What can only be done with beam? • Prioritise measurements. • Equipment needed: • Modules. • Read-out. • Telescope. • Mechanics. • Software. • Schedule. SciFi Tracker Test-beam Meeting

More Related