1 / 5

Status Report on PREPRO , TART and POINT

Status Report on PREPRO , TART and POINT. October 2008 by Dermott (Red) Cullen. Dermott (Red) Cullen has now retired from Lawrence Livermore National Lab. But he is continuing with his work His new contact information is Dermott E. Cullen 1466 Hudson Way Livermore, CA 94550

faye
Download Presentation

Status Report on PREPRO , TART and POINT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Report onPREPRO, TART and POINT October 2008 by Dermott (Red) Cullen

  2. Dermott (Red) Cullenhas now retired from Lawrence Livermore National Lab • But he is continuing with his work • His new contact information is • Dermott E. Cullen 1466 Hudson Way Livermore, CA 94550 tele: 925-443-1911 e.mail: RedCullen1@comcast.net website: http://home.comcast.net/~redcullen1

  3. Red continues to independently support • PREPRO = ENDF/B Pre-Processing codes • Presently PREPRO2007 • Available Internationally FREE on-line • http://www-nds.iaea.or.at/ndspub/endf/prepro/ • TART = Neutron/Photon Monte Carlo Transport • Presently TART 2005 • Available Internationally through Code centers • POINT = Current ENDF/B Data processed to Pointwise • Presently POINT 2007 = ENDF/B-VII.0 • Available Internationally FREE on-line • http://www-nds.iaea.org/point2007/

  4. Current Status (November 2008) • PREPRO – Updates are available to anyone • This includes updates for ENDF/B-VII • TART – Updates are available to Livermore Users • This includes the entire ENDF/B-VII Library • Currently Only PC Executables are Available • Contact Red Cullen for details • POINT 2007 – is still the Current ENDF/B Data • No planned updates until 2009

  5. Future Plans (2009) • Code and Data Releases are planned • for 2009 – this includes • PREPRO 2009 • Including improvements to existing codes • LINEAR, RECENT, SIGMA1, etc. • and new codes • Spectra – tabulated MF=5, 6, 7 data • Shield – self-shield homogenized geometry data • POINT 2009 • For Planned release of ENDF/B-VII.1 • TART 2009 • Wait and be surprised by NEW Capabilities

More Related