Learn about the production, processing, and supply of reinforcing steels in the reinforced concrete industry. Discover different steelmaking process routes, the quench and self-tempering process, and steel processing routes. Understand the importance of CARES Approved Fabricators in ensuring quality and maintaining traceability in cutting, bending, welding, and mechanical splicing processes.

fbutler
Download Presentation

Reinforcing Steel Process Routes & the Importance of CARES Approved Fabricators

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CARES and the reinforced concrete industry Providing confidence in reinforcing steels

  2. Production, processing and supply.

  3. Steelmaking process routes

  4. Steelmaking process routes

  5. Steelmaking process routes

  6. Schematic of Quench and Self Temper process

  7. Reinforcing steel process routes

  8. Steel processing routes Scrap ORE EAF BOS Microalloying Quenching and Self Tempering Cold Rolling Cold Stretching Bar Coil “sophisticated product”

  9. Standard Grade Re (MPa) Rm/Re A5 (%) Agt (%) BS 4449:1997 460A 460 1.05 12 2.5 BS 4449:1997 460B 460 1.08 14 5.0 BS 4449:2005 B500A 500 1.05a N/a 2.5b BS 4449:2005 B500B 500 1.08 N/a 5.0 BS 4449:2005 B500C 500 >1.15 1.30 N/a 7.5 a 1.02 for sizes < 8mm b 1.0% for sizes < 8mm Rm = Ultimate Tensile Strength Table 5. Comparison of properties.

  10. From specification to supply.

  11. How are CARES Approvedcompany’s specified ?

  12. Construction specifications • BS8110 (“Normal”) – BS4449 Grades A, B or C • BS5400 (Bridges) – BS4449 Grades B or C • BNFL (Nuclear) – BS4449 Grade C

  13. Rebar Supply Chain • Construction specification. • Design • Detailing • Reinforcement Scheduling (BS8666) • Reinforcement fabrication • Supply to Site

  14. The Importance of the CARES Approved Fabricator

  15. CARES Approved Fabricator • Vital part of the Supply Chain • Usual processes • Cutting and bending. • Welding (prefabrications) • Mechanical splicing (using couplers) • Stocking and distribution

  16. Cutting and Bending. Key responsibilities of Fabricator: • Material is correct to order • Cutting and bending is to the drawing • Material is not damaged during bending • Material retains properties • Cast traceability is maintained

  17. Welding - Prefabrications. Key responsibilities of Fabricator: • Steel is correct to order • Use of approved welding procedures • Use of approved and certificated welders • Use of approved welding equipment and consumables. • Welds are tested as required. • Traceability is maintained

  18. Application of mechanical couplers. Key responsibilities of Fabricator: • Use of approved couplers. • Use of correct machinery and equipment • Use of calibrated equipment • Use of approved operatives. • Testing of coupled joints as required. • Maintenance of Traceability.