250 likes | 255 Views
This article discusses the different phases and models in the software development process, including waterfall, V-model, rapid application development (RAD), spiral model, unified process, agile development, extreme programming (XP), adaptive software development (ASD), and Scrum.
E N D
The Software Process ECE 417/617:Elements of Software Engineering Stan Birchfield Clemson University
Life cycle phases 5 phases of every S/W life cycle: • Communication – requirements gathering, project initiation • Planning – determine tasks, risks, resources, work products, schedule; estimate, schedule, track • Modeling – create models to facilitate more precise communication and planning; includes analysis and design • Construction – code generation and testing • Deployment – delivery, feedback, support Two approaches: prescriptive and agile
Waterfall model Requirements Analysis System Design Object Design Coding Testing Installation Maintenance [adapted from Royce (1970)]
What is wrong with waterfall? Requirements Analysis Maintenance System Design Installation Object Design Testing Coding Interrelated nonlinear, sequential
V-model Requirements Analysis Acceptance Testing is validated by less detail System Design System Testing Object Design Unit Testing more detail Coding build system validate system
Incremental model increment #3 features version #3 A D C T M increment #2 version #2 A D C T M increment #1 version #1 A D C T M time
Rapid application development (RAD) Team #1 Modeling Communication Construction Planning Deployment Team #N Modeling Construction Developed by James Martin at IBM in 1980s RAD has largely been discredited because it has not proved successful "RAD is back", says IBM, Information Age, Feb. 10, 2006 http://www.information-age.com/articles/296861/rad-is-back-says-ibm.thtml 60 – 90 days
Prototyping Communication • Enables faster feedback • Can be incorporated into other models • But what is the danger? Feedback Quick plan Delivery Quick modeling Construct Prototype
Shark tooth model [from Michael Black]
Spiral model Deployment Communication start Construction Planning Modeling “Risk-driven approach” [developed by Barry Boehm, 1988]
Concurrent Each activity can be in a different state: none under development awaiting changes under review under revision baselined done
Unified process software increment inception Communication • Incremental, iterative • “Unified” same originators as UML • Also called Rational Unified Process (RUP) • Based on spiral model, developed at Rational Software, a division of IBM since 2003 Planning Deployment elaboration transition Modeling Construction construction
Unified process work products Inception phase vision document initial use-case model initial business case initial risk list project plan prototype(s) ... Elaboration phase use-case model requirements analysis model preliminary model revised risk list preliminary manual ... Construction phase design model SW components test plan test procedure test cases user manual installation manual ... Transition phase SW increment beta test reports user feedback ...
Agile development • S/W development is unpredictable • requirements will change (which ones?) • design and construction are interleaved(how much design is needed?) • analysis and testing, too • Solution: Use an adaptable process • incremental development strategy
Agile principles • Agile Manifesto (2001) values • individuals and interactions over processes and tools • working software over comprehensive documentation • customer collaboration over contract negotiation • responding to change over following a plan • Agile principles: • satisfy customer (highest priority) • early and frequent S/W delivery • welcome changing requirements • work daily with business people and developers • build projects around motivated individuals • simplicity: maximize the amount of work NOT done • self-organizing teams • regular reflection to adjust behavior to improve effectiveness
Extreme programming (XP) Kent Beck became project leader of Chrysler’s payroll project in 1996Project canceled in 2000 [from extremeprogramming.org] [Kent Beck, Extreme Programming Explained,1999]
A simpler view of XP spike solutions(prototypes) CRC cards design planning coding refactoring test unit test acceptance test continuous integration S/W increment
XP principles • Test-driven development • The planning game • On-site customer • Pair programming • Continuous integration • Refactoring • Small releases • Simple design • System metaphor • Collective code ownership • Coding standards • 40-hour work week Pros and cons?
Adaptive S/W development (ASD) • ASD focuses on human collaboration and team self-organization collaboration speculation learning S/W increment [Highsmith 2000]
Scrum • Backlog – prioritized list of project requirements or features • Sprints – work units required to achieve a requirement • deliver within fixed time (30 days) • no changes to requirement allowed during that time • Daily meetings (15 min.) • What did you do? • What obstacles are you encountering? • What is your plan? • Demos – S/W increments delivered to customer (can ship final product upon demand)
BDUF controversy • BDUF – Big design up front • Proponents claim that planning up front saves lots of time in the end • Much faster to fix a bug in the spec than in the code • An ounce of prevention is worth a pound of cure • Who is right? Both. Strive for balance.
Prescriptive models Waterfall Incremental RAD Spiral Concurrent development Component-based development Formal methods Aspect oriented Unified process (RUP) Agile models Extreme programming (XP) Adaptive software development (ASD) Dynamic systems development (DSDM) Scrum Crystal Feature driven development (FDD) Agile model Model summary
Synch-and-stabilize • How to balance structure and flexibility? • Solution: • Plan product with vision statement • Translate into specification document with enough detail to divide the work • Divide into parts and assign to teams • Teams are free to implement, innovate as they wish • Teams work under common environment • Teams check-in work frequently • Frequent (daily) builds • Always a working system • Easy to test, see defects, measure progress continually [from “How Microsoft Builds Software”, Cusumano and Selby]
Personal software process (PSP) • Individual developers should • measure the quality of output • plan (estimate and schedule work) • identify likely and actual errors • use metrics to improve process • Activities: (1) planning, (2) high-level design, (3) high-level design review, (4) development, (5) postmortem • Disciplined metrics-based approach to software engineering • Requires significant training • Improves productivity and quality, but resisted by many developers (culture shock) [SEI’s Watts Humphreys]
Team software process (TSP) • Project team should • be self-directed, able to plan and track their work, establish goals, and own their processes and plans • have consistent understanding of its overall goals and objectives • define roles and responsibilities • track quantitative project data • identify and implement an appropriate process for the project • define local standards • continually assess and respond to risks • track, manage, and report project status • Activities: (1) launch, (2) high-level design, (3) implementation, (4) integration and test, (5) postmortem • Rigorous approach that requires a full commitment from the team • Requires thorough training • Improves productivity and quality [SEI’s Watts Humphreys]