1 / 5

Freelancing Talk and Final Project Update

Join us for a brief talk about freelancing, including the process, pay rates/systems, and documentation. Afterward, continue working on your visual mockups/redesigns, which are due next week. Also, get updates on the final project, including the usability group research project, two visual mock-ups/comps, and updated digital client documentation.

feist
Download Presentation

Freelancing Talk and Final Project Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Information Architecture Week 16

  2. CALENDAR

  3. AGENDA • Brief Talk about Freelancing • The Process • Pay Rates/Systems • Documentation • Afterwards, continue working on your visual mockups/redesigns • They are due next week!

  4. FINAL PROJECT Due Week 17 • There are three primary parts to the final assignment: • Usability Group Research Project • You will all work as a team to collect data, analyze it, and update a web site that showcases all of the data and results. • Two Visual Mock-ups/Comps of your selected web site’s home page. • You will be redesigning the home page of the site that you have been studying during the first part of the semester. • You will be creating two (2) completely different designs. • Updated Digital Client Documentation Packet • Simply add a last page containing your 1st draft visual comps. Update the conclusion if necessary. Post it on your class web page.

More Related