150 likes | 391 Views
ISO / PC 283 Report From WG 1 Kristian Glaesel Convener WG 1 (as amended at the closing plenary). WG1 Meeting London Objectives. Establish WG1 methods Establish Working Draft 1 Friday at noon. WG1 plan between meeting. Establish Task group 5 “Terms and Definitions”
E N D
ISO / PC 283Report From WG 1KristianGlaeselConvener WG 1(as amended at the closing plenary)
WG1 Meeting London Objectives • Establish WG1 methods • Establish Working Draft 1 Friday at noon
WG1 plan between meeting • Establish Task group 5 “Terms and Definitions” • Establish draft paper for “Terms and Definitions” • Work on comments from “go through” • If needed work on comments from the individual experts
Method • Decision Log • Division into 4 task groups • Review of Document N30 • Plenary commenting on the full text
Task Group 1 Report • Clause 4– Context of OrganizationClause 5 – Performance LeadershipClause 7 -Support
Members TG1 • Peck Thian Guan, TG Leader, Singapore • Kathy Seabrook, scribe, US • Barbara Libowitzky, Austria • Yusuke Chiba, Japan • Peter Kwan Ming Cheng, Hong Kong • Julio Diaz Gerardi, Argentina • Sigrid Hansen-Tangen, Norway • Emily Sims, ILO • Trevor Dodd, UK • EckardMetze, Germany • Ian Wrightson, UK • Catherine Montagnon, France • Catherine Brakenhielm, ILO
Report • Discussion of Annex SL Text and Management systems concepts for a common understanding of our task. • Provided guidance on terms for the Terminology and Definitions Task Group: Worker, interested party, internal and external Issues, 5.3 • Suggested definitions needed for: workplace, worker, participation, consultation, interested parties, internal and external Issues • Guidance on Competence provided • Guidance on participation definition taking information from Z10, ILO. • Scope should be at least the boundary of the workplace.
Task Group 2 -Clause 6 -Planning • Members • FransGeijlvoet • Gilbert Ljungberger • Leonardo Omodeo-Zorini • Antonio Terracina • Miriam Shalom • Uwe Marx • Maria McKeown • AykutKirbas • Vic Toy • Stan Rodgers • Christele Hubert • Norma McCormick • EckehardBauer • Hilde Vatslid • Seiji Machida • Abdeljalil El Kholti • MohdRafeeBaharudin • Roque Portillo • Luisa Pellares • YoshitoHirambayashi • Janet Asherson • Chen Quan • Wang Shunqi • Martin Cottam • Sally Swingewood
Progress TG2 • Discussion of the type of definition we prefer for “risk” • Brief review of 11 comments on Section 6, and 3 comments on Risk • Clause by Clause review and adjustment of Section 6 • Final review and “sentencing” of comments • Final review and adjustment of Section 6 • Definition of Risk • Meaning of Opportunity • OHS risk and organisational risk
TG 3 Clause 8 - Operation • Members • Elizabeth O`Ferrall, • Berit Sørset, • Todd Hohn, • Tsuyoshi Kawakami, • Guillermo Zucal, • Thierry Lannuzel, • Andrew Foster, • Hussein Rahmat, • Hendri Farabi, • Damir Zorcec
Progress TG 3 • Restructured Clause 8 as follows • 8.1 Operational planning and control • 8.2 Management of change • 8.3 Outsourcing • 8.4 Emergency preparedness and response • Reviewed and amended subclause 8.4 and is now stable. • Reviewed and amended subclause 8.3; and is now complete.
Task Group 4 • SECTION 9 – Performance Evaluation • SECTION 10 – Improvement
Membersof TG 4 TheaDunmire Simone Cencetti Teresa Hawkins Armin Prey Christopher Ward Jerry Ramdunee Brenda Henry SyamsulZahrinZainudin
Progress • Discussion of the Annex SL Text and other source/guidance documents (CEN 17, ISO 14001) • Review and disposition of 16 comments on clauses 9 & 10 • Clause-by-clause review and discussion of requirements • Discussion of items to include in “Annex A” - Guidance • Final review of work product