1 / 15

ISO / PC 283 Report From WG 1 Kristian Glaesel Convener WG 1 (as amended at the closing plenary)

ISO / PC 283 Report From WG 1 Kristian Glaesel Convener WG 1 (as amended at the closing plenary). WG1 Meeting London Objectives. Establish WG1 methods Establish Working Draft 1 Friday at noon. WG1 plan between meeting. Establish Task group 5 “Terms and Definitions”

feo
Download Presentation

ISO / PC 283 Report From WG 1 Kristian Glaesel Convener WG 1 (as amended at the closing plenary)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO / PC 283Report From WG 1KristianGlaeselConvener WG 1(as amended at the closing plenary)

  2. WG1 Meeting London Objectives • Establish WG1 methods • Establish Working Draft 1 Friday at noon

  3. WG1 plan between meeting • Establish Task group 5 “Terms and Definitions” • Establish draft paper for “Terms and Definitions” • Work on comments from “go through” • If needed work on comments from the individual experts

  4. Method • Decision Log • Division into 4 task groups • Review of Document N30 • Plenary commenting on the full text

  5. Task Group 1 Report • Clause 4– Context of OrganizationClause 5 – Performance LeadershipClause 7 -Support

  6. Members TG1 • Peck Thian Guan, TG Leader, Singapore • Kathy Seabrook, scribe, US • Barbara Libowitzky, Austria • Yusuke Chiba, Japan • Peter Kwan Ming Cheng, Hong Kong • Julio Diaz Gerardi, Argentina • Sigrid Hansen-Tangen, Norway • Emily Sims, ILO • Trevor Dodd, UK • EckardMetze, Germany • Ian Wrightson, UK • Catherine Montagnon, France • Catherine Brakenhielm, ILO

  7. Report • Discussion of Annex SL Text and Management systems concepts for a common understanding of our task. • Provided guidance on terms for the Terminology and Definitions Task Group: Worker, interested party, internal and external Issues, 5.3 • Suggested definitions needed for: workplace, worker, participation, consultation, interested parties, internal and external Issues • Guidance on Competence provided • Guidance on participation definition taking information from Z10, ILO. • Scope should be at least the boundary of the workplace.

  8. Task Group 2 -Clause 6 -Planning • Members • FransGeijlvoet • Gilbert Ljungberger • Leonardo Omodeo-Zorini • Antonio Terracina • Miriam Shalom • Uwe Marx • Maria McKeown • AykutKirbas • Vic Toy • Stan Rodgers • Christele Hubert • Norma McCormick • EckehardBauer • Hilde Vatslid • Seiji Machida • Abdeljalil El Kholti • MohdRafeeBaharudin • Roque Portillo • Luisa Pellares • YoshitoHirambayashi • Janet Asherson • Chen Quan • Wang Shunqi • Martin Cottam • Sally Swingewood

  9. Progress TG2 • Discussion of the type of definition we prefer for “risk” • Brief review of 11 comments on Section 6, and 3 comments on Risk • Clause by Clause review and adjustment of Section 6 • Final review and “sentencing” of comments • Final review and adjustment of Section 6 • Definition of Risk • Meaning of Opportunity • OHS risk and organisational risk

  10. TG 3 Clause 8 - Operation • Members • Elizabeth O`Ferrall, • Berit Sørset, • Todd Hohn, • Tsuyoshi Kawakami, • Guillermo Zucal, • Thierry Lannuzel, • Andrew Foster, • Hussein Rahmat, • Hendri Farabi, • Damir Zorcec

  11. Progress TG 3 • Restructured Clause 8 as follows • 8.1 Operational planning and control • 8.2 Management of change • 8.3 Outsourcing • 8.4 Emergency preparedness and response • Reviewed and amended subclause 8.4 and is now stable. • Reviewed and amended subclause 8.3; and is now complete.

  12. Task Group 4 • SECTION 9 – Performance Evaluation • SECTION 10 – Improvement

  13. Membersof TG 4 TheaDunmire Simone Cencetti Teresa Hawkins Armin Prey Christopher Ward Jerry Ramdunee Brenda Henry SyamsulZahrinZainudin

  14. Progress • Discussion of the Annex SL Text and other source/guidance documents (CEN 17, ISO 14001) • Review and disposition of 16 comments on clauses 9 & 10 • Clause-by-clause review and discussion of requirements • Discussion of items to include in “Annex A” - Guidance • Final review of work product

  15. Thankyouall!

More Related