1 / 15

Renovating the Science Building

Renovating the Science Building: a faculty perspective. Renovating the Science Building. Departments currently in building: Biology Chemistry Earth Sciences and Science Education Physics Other programs: Great Lakes Center Environmental Toxicology Labs Physical Geography labs

fia
Download Presentation

Renovating the Science Building

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Renovating the Science Building: a faculty perspective Renovating the Science Building

  2. Departments currently in building: Biology Chemistry Earth Sciences and Science Education Physics Other programs: Great Lakes Center Environmental Toxicology Labs Physical Geography labs McNair Program Upward Bound program New York State Health Department Specialized Facilities : HIPERC Science Education Center Planetarium Small Animal Facilities Greenhouse Radioactive Materials Storage Volatile Chemical/ Gas Storage Potential additional occupants: Mathematics Department would allow for more meaningful interactions with the sciences Animal Behavior labs from Psychology Department near small animal facilities that are shared with Biology Requires construction of additional space Our Science Building is Multidisciplinary

  3. The current state of our building- a brief tour… 1960’s “wedding cake design” Lobby is dark and uninviting Long, dark, univiting hallways 1960’s style classrooms

  4. Faculty offices are behind labs or other offices Teaching labs are in poor condition Student Lounge Student Lounge/Computer lab Classroom redeployed as computer lab/club 30 years worth of wear and tear

  5. The renovated science building must provide modern spaces that allow programs to offer a pedagogically sound, modern learning experience for the next 25-30 years • Spaces must accommodate both traditional methods and new pedagogies for teaching math and science

  6. BSC Science Building needs modern ventilation/hood systems to support teaching science and doing research • Modern chemistry instructional labs require one hood per student and clear lines of sight • Molecular Biology and Anatomy labs need good ventilation • Geology/geochemistry often requires ventilation Current Ventilation System in BSC Anatomy Lab

  7. The Science Building requires air conditioning and climate control • Many programs run all summer • Faculty Research programs • Undergraduate summer research • Upward Bound • Physics Alternative Certification • Professional development programs • Scientific instrumentation and computers often willnot function above 78-85ºF • Some instrumentation dumps heat into the space compounding the problem • Building is currently too hot to grow yeast (requires 80ºF ) BSC Research lab retrofitted for summer research

  8. Corridors in building should be comfortable and inviting Spaces with light and seating encourage students to spend time in the building Students who have a sense of belonging are more likely to be retained

  9. Modern science buildings incorporate spaces that bring people together and encourage interdisciplinary activities • An atrium brings people together • Facilitates faculty-faculty, student-student, and faculty-student interactions • Can serve as a forum for poster sessions, science and math open houses, etc.

  10. Open stairways, clear site lines, and conversation nooks bring people together and encourage interdisciplinary activities

  11. We need a building that gives Buffalo State Sciences a public face • A facade that reflects the excellence in teaching and scholarship within • An atrium can make a big impact both inside and outside the building

  12. In contrast to what we currently have…. Lobby Main Entrance

  13. Building elements should advertise who we are • Building artwork can: • advertise our programs and research projects • acknowledge our many community partnerships • Great Lakes Consortium • Zoo • Science Museum • Educational partnerships with the public schools • Windows provide insight into how science is done

  14. Consider the advantages of a State-of-the-art Planetarium • would give Buffalo State Sciences a higher profile, public face • would further strengthen our ties to the public schools • Dickenson Science Building Planetarium and Observatory • -separate entrance to serve public access needs

  15. FNSS Science Building Planning Committee: We invite you to visit the building and welcome your comments Kim Bagley - Chemistry (Chair) Don Birdd-Science Education Lisa Brooks - Psychology Mike DeMarco - Physics Kim Irvine- Geography and Planning Harish Sikka - Great Lakes Laboratory Gary Solar - Earth Science Greg Wadsworth- Biology David Wilson - Mathematics To arrange a visit call 878-5933

More Related