1 / 8

14 April 2009 CLIC civil engineering layouts :

14 April 2009 CLIC civil engineering layouts : Summary of info gathered at CES meetings this year : - Injection Complex & BDS - Experimental area. CLIC Damping Rings schematic layout. e - DR to Booster linac transfer line. Dump. 205 m. 80 m. e - Damping Ring.

filia
Download Presentation

14 April 2009 CLIC civil engineering layouts :

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 14 April 2009 CLIC civil engineering layouts : Summary of info gathered at CES meetings this year : - Injection Complex & BDS - Experimental area

  2. CLIC Damping Rings schematic layout e- DR to Booster linac transfer line Dump 205 m 80 m e- Damping Ring e- PDR to DR transfer line e+ linac to PDR transfer line 157 m e- Pre-damping Ring 64 m e+ Pre-damping Ring e- linac to PDR transfer line e+ PDR to DR transfer line 205 m 80 m e+ Damping Ring e+ DR to Booster linac transfer line

More Related