IRM LIST. LN 90 Stand Alone SOI BOM corrections: 470Z1001-7 replace with -9 470Z1002-3 replace with -5 470Z1003-7 replace with -9 470Z1004-5 replace with -7 470Z1005-3 replace with -5 470Z1006-3 replace with -5 470Z1007-7 replace with -9 470Z1008-3 replace with -5
E N D
IRM LIST LN 90 Stand Alone SOI BOM corrections: 470Z1001-7 replace with -9 470Z1002-3 replace with -5 470Z1003-7 replace with -9 470Z1004-5 replace with -7 470Z1005-3 replace with -5 470Z1006-3 replace with -5 470Z1007-7 replace with -9 470Z1008-3 replace with -5 470Z1009-5 replace with -7 470Z1010-5 replace with -7 470Z1011-5 replace with -7 481Z0510-2 replace with -3 On SRR1882647_B_002_001: Remove 474Z0231-1 from the BOM, and add 474Z0231-5 and 474Z0231-6 On SRR1883834_B_001_001: Remove 474Z0231-1 from the BOM, and add 474Z0231-5, 474Z0231-6, and 474Z0231-7.
Step 1. Search for SOI’s in Analytics that have the ”old” IRM for AC90 and on Step 2. For AC90 all are complete so we cant revise…. Mark it as an X on the tracker sheet and Try AC91
Step 3: AC91 has one that we can revise. Step 4 : Go to SRR1861390 Validation and see if the MBOM can be revised Step 5: MBOM is COMPLETE so it can’t be revised… mark it on the tracker Sheet With an X
Step 6: Look at the follow on AC and see if it was corrected. In the case of 1861390.. It was…. Step 7: mark the sheet AC92 to 96 with a Y in the tracker sheet after you version the plan and correct the MBOM.
Step 8: Sheet should look like this. Step 9: repeat the same search now for AC97 Step 10: Now go to those SRR’s and repeat Steps 4 thru 7
Step 11: Notice that some SRR’s will have multiple IRMs so you should be able to do all at the same time in those Step 12: The tracker sheet has suspect SRR’s… if you finds ones not on the list just add them in.