60 likes | 70 Views
Agenda. Safety Schedule Machine and system reports. Safety and training. Safety: Ed Lessard . Schedule. Monday, April 18: 500 GeV pp physics run ended April 18-19: Jet calibration at injection energy April 19: set-up for 18 GeV Au-Au run (5-6 days)
E N D
Agenda • Safety • Schedule • Machine and system reports A. Fedotov, Time Meeting
Safety and training • Safety: Ed Lessard A. Fedotov, Time Meeting
Schedule • Monday, April 18: 500 GeV pp physics run ended • April 18-19: Jet calibration at injection energy • April 19: set-up for 18 GeV Au-Au run (5-6 days) • April 25 – May 2: 18 GeV Au-Au physics stores • May 2: set-up for 200 GeV Au-Au starts (1-2 weeks) • end of June/beginning of July (exact date TBD): end of 200 GeV Au-Au run. Maintenance/APEX: Wednesday, April 27 A. Fedotov, Time Meeting
Machine and system reports • RHIC Run-11 pp 500GeV Haixin Huang • STAR Qinghua Xu • PHENIX Takao Sakaguchi • AnDY Les Bland • RHIC Run-11 Heavy Ions Greg Marr A. Fedotov, Time Meeting
Machine and system reports • BLIP Leonard Mausner • Operations Peter Ingrassia • Jet Yousef Makdisi • Polarimeter • RF/9MHz • Linac/EBIS • RCF M. Ernst: “Services performed stably.” A. Fedotov, Time Meeting
Next Time meeting • Next Time meeting: April 26 A. Fedotov, Time Meeting