An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda • Safety • Schedule • Machine and system reports A. Fedotov, Time Meeting

  2. Safety and training • Safety: Ed Lessard A. Fedotov, Time Meeting

  3. Schedule • Monday, April 18: 500 GeV pp physics run ended • April 18-19: Jet calibration at injection energy • April 19: set-up for 18 GeV Au-Au run (5-6 days) • April 25 – May 2: 18 GeV Au-Au physics stores • May 2: set-up for 200 GeV Au-Au starts (1-2 weeks) • end of June/beginning of July (exact date TBD): end of 200 GeV Au-Au run. Maintenance/APEX: Wednesday, April 27 A. Fedotov, Time Meeting

  4. Machine and system reports • RHIC Run-11 pp 500GeV Haixin Huang • STAR Qinghua Xu • PHENIX Takao Sakaguchi • AnDY Les Bland • RHIC Run-11 Heavy Ions Greg Marr A. Fedotov, Time Meeting

  5. Machine and system reports • BLIP Leonard Mausner • Operations Peter Ingrassia • Jet Yousef Makdisi • Polarimeter • RF/9MHz • Linac/EBIS • RCF M. Ernst: “Services performed stably.” A. Fedotov, Time Meeting

  6. Next Time meeting • Next Time meeting: April 26 A. Fedotov, Time Meeting