An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Duncan Flood Event – Lessons LearnedPublic Safety Department

  2. Building up the existing dike along Beverly Street

  3. The massive effort to stop the flood waters flowing into a dense neighbourhood Nanaimo Fire Services Presentation June 2010

  4. Initial Low Dike building on roadway • Long rolls of heavy duty poly laid down along roadway on the side the water is coming from • Use cement truck full of sand to run the course and lay a 1 – 2 foot “bead” of sand the length of the poly • Fold poly up and over on both sides • Place regular sandbags every two feet to keep poly sealed

  5. Initial Dike complete, pumping begins and a rainbow gives us hope Nanaimo Fire Services Presentation June 2010

  6. Developing a more secure dike to get us through the winter

  7. Filling the gaps – to save time, just fold under the tops of the sandbags

  8. Time to call it a day?

  9. Thank you!Public Safety Department