240 likes | 408 Views
Development and Energy in Africa. First National Workshop: Botswana 6 September 2005 Introduction Gordon A. Mackenzie Energy for Development Risø National Laboratory. Outline of presentation. Introduction to the DEA project Objectives Energy and the MDGs
E N D
Development and Energy in Africa First National Workshop: Botswana 6 September 2005 Introduction Gordon A. Mackenzie Energy for Development Risø National Laboratory DEA: First National Workshop
Outline of presentation • Introduction to the DEA project • Objectives • Energy and the MDGs • Relationship to other initiatives • Project structure and schedule • Work packages • Advisory Committee DEA: First National Workshop
Development and Energy in Africa (DEA) • A project of the EC COOPENER Programme • start 1 May 2005, duration 30 months • implemented by Risø National laboratory, Denmark (coordinator) • Energy Centre of the Netherlands (ECN) • 6 African Centres Overall aims: • to identify and examine the developmental impacts of energy innovations • to use the information obtained to improve on-going and future energy interventions DEA: First National Workshop
Centres in 6 African countries: MFC, Mali TaTEDO, Tanzania ENDA, Senegal CEEEZ, Zambia KITE, Ghana EECG, Botswana DEA: First National Workshop
Immediate Objectives • to establish and apply an Assessment Framework for evaluating development and poverty impacts of energy interventions • to engage in a dialogue with energy policy makers and other stakeholders on the basis of the framework, with a view to incorporating these issues in energy policy. DEA: First National Workshop
Why an Assessment Framework? • Energy access is a necessary but insufficient input for development • Energy access helps to achieve MDGs • How much? How? • Can it be measured and documented? • Could it help us design projects that have more development impact? • Could documented evidence of development impact help obtain more funding? • Could it encourage more inter-sectoral cooperation? • How can such information help policy makers and other stakeholders? DEA: First National Workshop
Energy and the MDGs Source: DFID 2002 Energy for the Poor. Underpinning the MDGs DEA: First National Workshop
Assessment Framework data, elements of success, indicators How does information feed into policy formation, decision making and implementation? energy project #1 information energy project #2 Development impact of energy projects Policy + Project Design + Feasibility studies + Funding Development Impacts DEA: First National Workshop
Information on project impacts and the policy process • How does information about project success or failure and impacts get incorporated into policy? • How does experience from real project outcomes (success, failure, impacts) play a role in new project formulation and implementation? • What kind of information could be useful to policy makers? • How can this information come to the attention of policy makers/stakeholders? DEA: First National Workshop
GVEP GNESD EUEI DEA AREED REEEP DEA and other energy-development initiatives DEA can contribute, directly or indirectly, to all the initiatives GVEP DEA: First National Workshop
DEA – Development and Energy in Africa • Develop an Assessment Framework for measuring impact of projects on MDGs or SD • DEA aims at a “tool” or “systematic approach” to measure impact of energy projects • Potentially useful for all initiatives, and national policy making – assess existing interventions and design better ones in future DEA: First National Workshop
Oct 2007 July 2007 March 2007 Nov 2006 Oct 2006 Sep 2006 April 2006 March 2006 Oct. 2005 Aug. 2005 July 2005 May 2005 Project Reporting and Completion WP9: Common Dissemination WP8: Dissemination WP1: Project Management WP4: consultation with policy makers and stakeholders WP3: Catalogue of energy interventions WP2: Literature review WP4: Continued Consultation with Stakeholders Regional Workshop National Workshops # 3 • WP7: Assessment Framework • refinement • recommendations • WP6: Case Studies • application of PAF on selected examples of energy interventions National Workshops # 2 • WP5: Preliminary Assessment Framework (PAF) • Classify linkages • Design procedures • Identify indicators National Workshops # 1 DEA: First National Workshop Inception Phase – Kick-off workshop
Work Packages • management • literature review • catalogue of energy interventions • consultation with national policy makers and stakeholders • preliminary assessment framework • case studies • refinement • dissemination • common dissemination DEA: First National Workshop
Workshops Project workshops • kick-off – May 2005 • mid-term – April 2006 • final – November 2006 National workshops • consultation –September - October 2005 • case studies – September 2006 • final – dissemination – April 2007 Regional workshop • July 2007 DEA: First National Workshop
Advisory Committee DEA: First National Workshop
END DEA: First National Workshop
WP2: Literature Review • leader of Work Package: Risø • duration 3 months • Issues: • Development- energy links • Methodologies and indicators • Development impacts of other (non-energy) interventions • Activities: • conduct survey • classify and discuss methods and indicators • Outputs: • Report addressing the issues • Input: • Risø 154 hours • ECN 62 hours • Centres 31 hours each DEA: First National Workshop
WP3: Catalogue of Energy Interventions • leader of Work Package: ECN • duration: 3 months • Purpose: create a catalogue or database of relevant energy interventions • choose from these the case studies to test the Assessment Framework • Terms of Reference (ECN with Risø assistance) • Compile national catalogue (Centres) • Synthesize overall catalogue (ECN) • ECN: 277 hours • Risø: 123 hours • Centres: 123 hours each • Output: national catalogues + synthesis report DEA: First National Workshop
WP4: National Consultations leader of work package: Risø duration: throughout project purpose: • link with policy makers and stakeholders • ensure relevance of approach to national conditions and needs Activities: • prepare workshop material • hold workshops and bilateral consultations in country • inform stakeholders through the process Risø: 93 hours ECN: 62 hours Centres: 123 hours each DEA: First National Workshop
WP5: Preliminary Assessment Framework leader of Work Package: Risø purpose: central element of the project outputs: • Description of an operational Assessment Framework • Recommendations for Case Studies Risø: 524 hours ECN 124 hours Centres: 186 hours each DEA: First National Workshop
WP6: Case Studies leader of Work Package: Risø purpose: test the Assessment Framework in real situations Activities: • meeting to agree on common structure • practical arrangements • case studies • reporting • discussion with stakeholders (National W/S 2) • synthesis report Risø: 155 hours ECN: 84 hours Centres: 185 hours DEA: First National Workshop
WP7: Analyse Case Studies and Refine Methodology • leader of Work Package: Risø • adjust and refine the methodology on basis of case studies • draft report on approach, discuss with partners • final report and manual • Risø: 339 hours • ECN: 124 hours • Centres: 186 hours each DEA: First National Workshop
WP8: Dissemination leader of work package: Risø Activities • web site • presentation material • workshops • regional (Africa) workshop • disseminate to other countries • contact with other EU member state programmes Risø: 278 hours ECN 93 hours Centres 372 hours DEA: First National Workshop
WP9: Common dissemination • contribution to EC activities • presentation with other COOPENER projects • preparation of common presentation material • Risø: 93 hours • ECN: 31 hours DEA: First National Workshop