Integrated environmental monitoring Principal Researcher Vidar Hepsø Ph.D Statoil RD Environmental Technologies . Paradigm shift. From “expeditionary” offline sampling. To continuous environmental monitoring. Gain licence to operate by demonstrating prudent operations in sensitive areas.
E N D
Integrated environmental monitoring Principal Researcher Vidar Hepsø Ph.D Statoil RD Environmental Technologies
Paradigm shift From “expeditionary” offline sampling To continuous environmental monitoring Gainlicence to operate by demonstrating prudent operations in sensitive areas
Integrated Environmental Monitoring Business Operations Planning Decision making Workflow Knowledge Sharing & Analytics Learning Analysis Sense making Information & Collaboration Virtual interaction Coordination Shared awareness Intelligent Infrastructure Access Connect Sense Background photo: Harald Pettersen 3 -
Scenarios Preparation Production Demobilization Drilling A B C D E Seismic & exploration /production drilling. Maybe no permanent infrastructure. Production. Full real-time IEM in place. No oil & gas activity Off-line. No infrastructure. Background data. Installation. Transition to permanent monitoring system. Shut down/after production. Limited infrastructure. Off-line. • 3 infrastructure situations • Area with no infrastructure • Field with limited power supply and data communication (typically old fields) • Field with subsea power supply and fibre optic communication (typically new fields)
Thank you Integrated environmental monitoring Presenters name: Vidar Hepsø Presenters title: Principal Researcher /Project Manager vihe@statoil.com, tel: +47 48034803 www.statoil.com
Current Practice - Monitoring regimes To be carried out by independent 3rd party Point samples of selected physical/chemical and biological parameters Sediments Water column Soil Ground water Remote sensing Follow-up after spills Visual surveys
Current Practice - challenges Flexibility Monitoring must be suited to the actual habitat Physical sampling may harm sensitive habitats Response time of point sampling Significant time lag between impact occurrence and detection Cost-effectiveness Can be improved through integration in design and operations
Morvin, Norway • Located in the Norwegian sea • Area with cold water coral structures • On-line monitoring before, during and after drilling • Physical/chemical data • Visual monitoring • Real time monitoring proved no harm to the coral structure 9 - 9 - Classification: Internal 2011-02-03 Classification: Internal 2010-10-19