An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Evaluation of V2I Technologies How to Adjust Cost-Benefit-Analyses (CBA) to ITS? Dipl.-Ing. Wolfgang Niebel German Aerospace Center (DLR), Institute of Transportation systems

  2. Content • Evaluation Cost-Benefit-Analyses • V2I Technologies Cooperative ITS • Adjustments  CBA with Microsimulation • Results   ?  • Outlook  Future Research Evaluation of V2I Technologies

  3. Introduction l = 1 km q = 15.000 veh/d v = 20 km/h t = 3 min •  •  •   Evaluation of V2I Technologies

  4. Introduction l = 1,7 km q = 15.000 veh/d v = 50 km/h t = 2 min  t = 1 min •  •  •   Evaluation of V2I Technologies

  5. CBA in Road Projects          Evaluation of V2I Technologies

  6. V2I Technologies in • Cooperative ITS + ADAS (ACC) GLOSA Evaluation of V2I Technologies

  7. Adjustments: Scale of Model Evaluation of V2I Technologies

  8. Adjustments: Cooperative ITS Evaluation of V2I Technologies

  9. Adjustments: Extrapolation „Modellingtrafficas a stochasticalsystem [ratherthanasdeterministicchaos] seemsmore plausible tome.“ (Prof. Dr. Dr. Reinhard Selten, Nobel Prize Economy 1994) Evaluation of V2I Technologies

  10. Extrapolation I: Stochastics nsim= 17 n =1.088 nclassx=14+1 nclassy=7+1 Evaluation of V2I Technologies

  11. Extrapolation II: Probability 14,3% 14,3% 14,3% 28,6% 28,6% Evaluation of V2I Technologies

  12. Extrapolation III: Load Curves Evaluation of V2I Technologies

  13. Extrapolation IV: Relevant Hours Evaluation of V2I Technologies

  14. Results I Evaluation of V2I Technologies

  15. Results II Evaluation of V2I Technologies

  16. Outlook • Extrapolation othercriteria? • Bayesian Network q(t-1)v(t) • Travel time : workdays sundays • Differentprobability distribution? Evaluation of V2I Technologies

  17. Acknowledgements The KOLINE project was granted by the German Federal Ministry of Economics and Technology (BMWi) according to a decision of the German Federal Parliament within the 3rd transport research framework “Mobility and Transport Technologies”. Project partners: • TU Braunschweig • Institute of Transportation and UrbanEngineering • Institute of Control Engineering • Institutfür Automation und Kommunikatione.V. Magdeburg (ifak), • TransverGmbH Munich, • Volkswagen AG Wolfsburg (VW) Evaluation of V2I Technologies