1 / 8

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation. API Production Research Advisory Committee Pete Moore – API PRAC Chairman Peter Ellis – Program Manager. PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris. Detailed Mill Test Report

flint
Download Presentation

PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PRAC Project Phase III: Sour Service Evaluation of ISO TR 10400 FAD Equation API Production Research Advisory Committee Pete Moore – API PRAC Chairman Peter Ellis – Program Manager

  2. PRAC III C110 Test Pipe Were Donated and Shipped to Honeywell by Tenaris Detailed Mill Test Report Documenting the Pipe Characterization Attributes

  3. PRAC III – Phase 3 Details • Testing Details: • NACE Standard TM0177 Method A – Tensile tests complete • NACE Standard TM0177 Method D – DCB tests complete • Mini/Tiny-Pipe SSC Tests – Machining Complete – EDM Notch cutting Complete – H2S Depletion test Complete – Klimit in 7% H2S solution, In-progress – Tiny Pipe testing, expected to begin 4th Qtr 2013 • Full Scale Tests with Man-made OD Surface Imperfections • ID/OD and OD only or ID only H2S Exposure – Pressurized ID environment and OD exposure with replenishment/purging of 7% H2S in solution held in annular volume between plastic sleeve and OD of sample. – Testing to begin 2nd quarter 2014

  4. ~ 4 inches EDM OD Notch Machining of Tiny Pipe Complete EDM Notching Complete

  5. Tiny Pipe H2S Depletion Test Soaked in 100% H2S for 17.72 hours, then flushed with distilled H2O 60% Depletion 40% Depletion

  6. 7% NACE A Enviroment

  7. Testing of Full Size PipeTo Begin 2nd Quarter 2014

More Related