1 / 41

Chapter 3 Prescriptive Process Models

Chapter 3 Prescriptive Process Models. Software Engineering: A Practitioner’s Approach, 6th edition by Roger S. Pressman. Software process model. Attempt to organize the software life cycle by defining activities involved in software production order of activities and their relationships

flo
Download Presentation

Chapter 3 Prescriptive Process Models

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Chapter 3Prescriptive Process Models Software Engineering: A Practitioner’s Approach, 6th edition by Roger S. Pressman

  2. Software process model • Attempt to organize the software life cycle by • defining activities involved in software production • order of activities and their relationships • Goals of a software process • standardization, predictability, productivity, high product quality, ability to plan time and budget requirements

  3. Code&Fix The earliest approach • Write code • Fix it to eliminate any errors that have been detected, to enhance existing functionality, or to add new features • Source of difficulties and deficiencies • impossible to predict • impossible to manage

  4. Models are needed • Symptoms of inadequacy: the software crisis • scheduled time and cost exceeded • user expectations not met • poor quality • The size and economic value of software applications required appropriate "process models"

  5. Process model goals (B. Boehm 1988) "determine the order of stages involved in software development and evolution, and to establish the transition criteria for progressing from one stage to the next. These include completion criteria for the current stage plus choice criteria and entrance criteria for the next stage. Thus a process model addresses the following software project questions: What shall we do next? How long shall we continue to do it?"

  6. Process as a "black box" Quality? Uncertain / Incomplete requirement In the beginning

  7. Problems • The assumption is that requirements can be fully understood prior to development • Interaction with the customer occurs only at the beginning (requirements) and end (after delivery) • Unfortunately the assumption almost never holds

  8. Process as a "white box"

  9. Advantages • Reduce risks by improving visibility • Allow project changes as the project progresses • based on feedback from the customer

  10. The main activities of software production • They must be performed independently of the model • The model simply affects the flow among activities

  11. Prescriptive Models Prescriptive process models advocate an orderly approach to software engineering That leads to a few questions … • If prescriptive process models strive for structure and order, are they inappropriate for a software world that thrives on change? • Yet, if we reject traditional process models (and the order they imply) and replace them with something less structured, do we make it impossible to achieve coordination and coherence in software work?

  12. The Waterfall Model

  13. Waterfall Model Assumptions 1. The requirements are knowable in advance of implementation. 2. The requirements have no unresolved, high-risk implications • e.g., risks due to COTS choices, cost, schedule, performance, safety, security, user interfaces, organizational impacts 3. The nature of the requirements will not change very much • During development; during evolution 4. The requirements are compatible with all the key system stakeholders’ expectations • e.g., users, customer, developers, maintainers, investors 5. The right architecture for implementing the requirements is well understood. 6. There is enough calendar time to proceed sequentially.

  14. Analysis Design Construct System test Process for Offshore? Accept. test Deploy

  15. If we rely on testing alone, defects created first are detected last User Need Product Release system test plan System Requirements System Testing software test plan Software Requirements Software Testing integration plan Software Design Integration Testing unit plan Software Implementation Unit Testing time The V Model

  16. Incremental Models: Incremental

  17. Incremental Models: RAD Model

  18. Evolutionary Models: Prototyping

  19. Risk Exposure

  20. Unified Process Model A software process that is: • use-case driven • architecture-centric • iterative and incremental Closely aligned with the Unified Modeling Language (UML)

  21. The Unified Process (UP) inception

  22. UP Work Products inception

  23. Lifecycle for Enterprise Unified Process inception

  24. Synchronize-and Stabilize Model • Microsoft’s life-cycle model • Requirements analysis—interview potential customers • Draw up specifications • Divide project into 3 or 4 builds • Each build is carried out by small teams working in parallel

  25. Synchronize-and Stabilize Model (contd) • At the end of the day—synchronize (test and debug) • At the end of the build—stabilize (freeze build) • Components always work together • Get early insights into operation of product

  26. Evolutionary Models: The Spiral

  27. Spiral Model • Simplified form • Waterfall model plus risk analysis • Precede each phase by • Alternatives • Risk analysis • Follow each phase by • Evaluation • Planning of next phase

  28. Simplified Spiral Model • If risks cannot be resolved, project is immediately terminated

  29. Full Spiral Model • Radial dimension: cumulative cost to date • Angular dimension: progress through the spiral

  30. Full Spiral Model (contd)

  31. Analysis of Spiral Model • Strengths • Easy to judge how much to test • No distinction between development, maintenance • Weaknesses • For large-scale software only • For internal (in-house) software only

  32. Object-Oriented Life-Cycle Models • Need for iteration within and between phases • Fountain model • Recursive/parallel life cycle • Round-trip gestalt • Unified software development process • All incorporate some form of • Iteration • Parallelism • Incremental development • Danger • CABTAB

  33. Fountain Model • Features • Overlap (parallelism) • Arrows (iteration) • Smaller maintenance circle

  34. lightweight middleweight heavyweight Software Process Spectrum Crystal Clear Crystal Violet ICONIX DSDM OPEN XP FDD RUP SCRUM EUP dX

  35. Conclusions • Different life-cycle models • Each with own strengths • Each with own weaknesses • Criteria for deciding on a model include • The organization • Its management • Skills of the employees • The nature of the product • Best suggestion • “Mix-and-match” life-cycle model

  36. Model Driven Architecture

  37. What is MDA in essence? • Automated approach to translate high level design to low level implementation by means of separation of concerns • From high-level model to running application • Risk proportional to expectations!

  38. Finding the “right” language Developer Model Driven Architecture Automation Abstraction IDEs & 4GL 3GL Assembler Computer Hardware

  39. “You should use iterative development only on projects you want to succeed” Martin Fowler

  40. Model Driven Architecture • Can you actually have incremental MDA? • Or is it automated waterfall? • Need rigorous models • Need high quality requirements • Capture requirements • Understand requirements

  41. MDA or Offshore? • Automation versus reduce cost of labor • Objectives • Reduce required intelligence • Increase repetition • Goal • Reduce costs of development

More Related