Module 2: Enhanced Systems. When it’s more than a straight pipe from the catch basin to the waterbody. Stormwater System Maintenance: A 4-Part Workshop Series. How we identify & describe structural BMPs. How we inspect, clean & repair structural BMPs. Today we will review. We will.
E N D
Module 2: Enhanced Systems When it’s more than a straight pipe from the catch basin to the waterbody Stormwater System Maintenance: A 4-Part Workshop Series
How we identify & describe structural BMPs How we inspect, clean & repair structural BMPs Today we will review
We will • Review the goals as written in the General Permit • Clarify or expand as needed • Review what we are doing now • Review how we report our activities • Look for ways to improve our effectiveness and/or efficiency
O&M Program • Required Goal • Identify, locate & describe all structural BMPs owned or operated by the MS4 operator
Why do we have them? • In response to the changes in stormwater runoff as land use changed from undeveloped to developed
What are they supposed to do? • First generation: flood control • Late 1970’s, early to mid-80’s • Requirement incorporated into subdivision regulations • Second generation: water quality benefits (treat pollutants) • Mid to late 1980’s • Modified basin designs • Proprietary structures • Focus on total suspended solids (TSS) • Current emphasis: improved treatment and volume control • Low Impact Development (LID) • Small scale controls
The Smart Development for a Cleaner Bay Act of 2007 • Amend Stormwater Design & Installation Standards Manual • Regulatory programs require use of low-impact design techniques
Runoff from our watersheds Flows to other MS4s Flows to State system Flows to city/town system Flows to private system Flows directly to stream, pond, etc. (Chart for illustrative purposes only, based on Best Professional Judgment of Southern RI Conservation District)
Our stormwater system Flow to private BMP or other MS4 Flow to MS4 BMP Pipe directly to surface water (Chart for illustrative purposes only, based on Best Professional Judgment of Southern RI ConservationDistrict)
Private Structures • Municipality permitted development based on some level of water management • Municipal system now dependent to some degree on BMPs functioning properly • Therefore, need to know where they are & what condition they are in
Private Structures • Post-Construction Minimum Measure requires us to identify private BMPs, inspect and enforce O&M
Ideal • You know where & how stormwater runoff flows in the watersheds of your MS4 • You know who’s responsible for the performance of each system
You know: • Where structures are • What condition they’re in • Who is responsible
Problems? • Records of what’s gone on the ground in the past thirty years may have slipped through the cracks • May not know where all structures are • May not have designs/as-builts • May not know who’s responsible for maintenance • May not have O&M plans
Our Structural BMP Inventory • Maps • Database • Update
Why a Database? • Track maintenance and inspection • Streamline processes • Scheduling inspections/maintenance • Sending notices to private owners • Reporting • Provide documentation • Develop program cost estimates • Identify retrofit opportunities • Evaluate program effectiveness
RIGL 45-61.1-3.(b) • “A regulated small MS4 shall designate…those storm drainage systems that are prone to street flooding and/or contribute significantly to storm water management problems.” • Structural BMPs included in definition of “storm drainage system”
Updating Required • Update • As new structures are installed • As forgotten structures are found • As maintenance is performed • Report • Include in MS4 Annual Report
What if I find “something” that’s not on the map, or an error in the map? • Note the location on a copy of the map • Describe the structure and its condition, or note what the error is • Submit the map and note to the Engineering office
O&M Program • Required Goal • Procedures for inspections, cleaning & repair of detention/retention basins and related storm sewers, catch basins • Inspection & maintenance schedule • BMP-specific as approved, modify based on reports • Maintain records
How is a BMP supposed to work? Runoff from a given area (catchment) is directed to a structure
A structural BMP holds the water back until at least one of the following occurs • Design peak flow is over • Water infiltrates • Solids settle out • Pollutants are filtered or taken up by vegetation
ENVIRONMENTAL CONDITIONS Actual climate & catchment conditions are similar to design conditions BMP CONDITIONS Well-designed Built as designed Maintained Performance depends on MAINTENANCE IS REQUIRED
Common Performance Problems • Structure volumes are insufficient for the amount of water they receive • May have been sized/built wrong • Catchment may have changed (size and/or land use) • Volume may be reduced by sediment, vegetation and/or litter
Swale completely filled with sediment, vegetation and debris (Inlet buried)
Common Performance Problems • Outlet controls don’t function as intended • Design errors • Installation errors • Especially compaction of infiltration systems • Controls are clogged by sediment, vegetation and/or litter • Mechanical controls are broken • Cumulative impact
What is cumulative impact? • Multiple structures, each slowly releasing increased runoff • Results in increased volume of water moving downstream • Timing of releases can increase flooding
Our Inspection Procedures • Schedule • Routine inspections • Non-routine inspections • Inspection forms • Post-storm checks • Reports
RIGL 45-61.1-2. • “…systems prone to flooding or contributing significantly to storm water management problems shall be inspected at least once per year…”
Routine Two times per year After every big storm (blockage of inlets or outlets) Non-routine to be scheduled based on Physical condition noted in routine inspection Tendency to flood Watershed address Ideal Inspection Schedule
Unexpected ponding Obstructions of inlet or outlet Cracking or settling Excessive erosion or sedimentation Signs of dumping or vandalism Encroachment Healthy vegetation under control Pipes, fences, etc. in good condition Stability of sideslopes & downstream channel Emergency spillway in good condition Routine Inspections
Non-routine inspection • Need original design/as-built for comparison • Check structure volume • Check size, types of inlets, outlets • Check elevations • Dam/top of structure • Inlets • Outlets • Verify catchment assumptions
BMP Maintenance • Customized O&M Plan • Permit requirements • Inspection results
Vegetation control by mowing or removal of undesired plants Debris & litter control Minor bank stabilization & erosion control Access to inlets & outlets maintained Routine maintenance
Non-routine maintenance • Mechanical components • Sediment removal • Recondition soils for infiltration • Replacement/retrofit
Waste Disposal • Trash & litter to landfill • Vegetation to compost or chipper • Dewater sediments • Use as daily cover or • Test for use as fill
Using results of maintenance records • Revise inspection & maintenance schedules • Improve design, site plan review for ease of maintenance • Evaluate opportunities for retrofit • Improve program cost estimates
Structure purpose: Reduce flooding Improve water quality Good Housekeeping purpose: Enable structures to perform adequately Enhanced Systems
Stormwater System Maintenance: Employee Training Brought to you by: This program was developed by the Southern Rhode Island Conservation District in partnership with the URI Cooperative Extension RI NEMO Program and the Rhode Island T2 Center. Funding was provided by the RI Department of Environmental Management and the RI Department of Transportation under the Phase II Stormwater Education and Outreach Project.