1 / 46

Allergen Control Strategies - A “How To” Guide

Allergen Control Strategies - A “How To” Guide. Hormel Foods Corporation Brent Brehmer Corporate Manager of Regulatory Compliance & HACCP. F/Y 2011 – Consumer Response handled > 140,000 contacts – Top questions:. 1. Where to purchase products 2. Shelf-Life questions 3. Coupon requests

flynn
Download Presentation

Allergen Control Strategies - A “How To” Guide

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Allergen Control Strategies- A “How To” Guide Hormel Foods Corporation Brent Brehmer Corporate Manager of Regulatory Compliance & HACCP

  2. F/Y 2011 – Consumer Response handled > 140,000 contacts – Top questions: • 1. Where to purchase products • 2. Shelf-Life questions • 3. Coupon requests • 4. Allergen & Gluten questions

  3. Actual Customer Comments/Questions • “Is Chi Chi’s Salsa gluten free?” • “Is there dairy is potassium lactate?” • “I just wanted to thank you for going the extra mile for people w/ Celiac Disease. I noticed you even put “gluten-free” on some of your labels. My 5 yr old has the disease & she loves your pepperoni. I can’t tell you how hard it is to stick to her diet & I am so thankful for companies who have regular food that is gluten-free so our whole family can eat the same foods. I can tell you that as long as you’re taking the precautions to keep them gluten-free, I will be a devoted Hormel customer…”

  4. Allergen Program – What Does One Look Like? • Hormel’s • 110+ Food Safety Assessments • 30 GFSI Audits Annually • Dozens of Customer Audits

  5. Allergens & HACCP • Allergens are a “Chemical” Hazard • Hazard = presence of an Unlabeled Allergen • Control Point or CCP? • Prerequisite Program • Hazard Not Likely to Occur • Ingredient Usage Page - Added “Allergen” section.

  6. Added “Allergen” Category

  7. Possible CCPs • Product Changeover • Labeling • Control of Rework

  8. Starts at “Product Formulation” • R&D

  9. Product Development Strategies • Determine allergenicity of ingredients; • Avoid allergenic ingredients which have no functional effect on the finished product • Find substitutions for allergenic ingredients! • Identify Allergens on Formulas sent to plant.

  10. Hormel’s Allergen Program • “Big 10” • Big 8 + Sesame Seeds + Molluscan Shellfish • List on file: • At Corporate • In Plant • New Ingredients • HACCP Plan.

  11. Incoming Ingredients – Labeling Requirements of Allergens • “Allergen” Sticker on each Pallet • 5” x 8” • Brightly Colored • Supplier Applies • If not on, • Apply at Receiving & • Notify Supplier • Easily readable on walk-throughs.

  12. Storage of Ingredients • Ideal - Dedicated Room or at Least Rows • Realistic – No Allergens stored above non-allergenic product.

  13. Open to contamination or able to cross-contact other products.

  14. “Cross Contact” NOT “Cross Contamination”

  15. Milk Item Improper Storage

  16. Storage of Ingredients - Bulk • Containers Labeled • Dedicated (Color-coded) Scoops • Procedures - Employees in Spice Rooms working w/ Allergens must: • Wear Disposable outerwear (sleeves, aprons & gloves); • Change outerwear & wipe down helmet at: • Each break • When changing to other non-allergen product.

  17. Product Scheduling • Huge • More important than “color” issues • Order must be: • Non-Allergen first • Allergen #1 • Allergen #1 & Allergen #2 • Etc. • Allergen Cleanup

  18. Changeovers – Validation of Cleanups • 3 Separate Runs on our Production Lines • Choose Product Based On: • Highest Percentage in Product • Toughest to Clean (i.e. Burn-On) • Run Allergenic Product & Pull Control Sample • Conduct the planned “Allergen Cleanup” • Record Procedures Used (Full 4-Step Cleanup, Water Rinse, Sugar Rinse, etc.) • Run Non-Allergenic Product & Pull Samples: • First Unit, after 5 minutes, after 10 minutes

  19. Changeovers – Validation of Cleanups – (continued) • Test Control Product & Changeover Product • University of Nebraska (Lincoln) – FARRP or • On-Site using approved test kits (i.e. Neogen® - pending Corp. approval) • Must choose Level • i.e. 10 ppm, 5 ppm, 2.5 ppm • HOLD ALL PRODUCT PENDING RESULTS!!!!! • Disposition • “Negative” – Release Product • “Positive” – Contact Corp. QC for disposition • Record Results on “Allergen Validation Testing Record”

  20. Neogen.com

  21. Rework Requirements • Label • Store Properly • Exact Into Exact • NOT Like Into Like • Record Code Dates • Implement Rework Cycle Breaks.

  22. Procedures for “Suspect” Product • Place all suspect product on HOLD; • Call Brent

  23. Label Verification Program

  24. Incoming Labels • Pull 1 from each incoming lot - Place on Hold until: • Compare the Big 9 (Hormel Term) • Ingredient Listing • Est. # • Nutrition Facts Panel • Net Wgt • Address Line • Safe Handling Instructions (Raw items) • Product of Identity • Manufacturer ID (37600 on Bar Code Label) • SI # + Version • S0044208-24 (15 oz. CWB – 24th version)

  25. Incoming Multiple-Component Ingredients • Place on Hold • Compare Ingredient Listing to Approved File.

  26. Formulation Changes • Line Trial System – • New Product • Reformulation • Unique Number Assigned to Each • Hold & Release Program • If Approved • System in place to convert

  27. Formulation Verification (Batching) • Record Item / SI numbers • Record Lot Numbers • In-Process Labels • Must have Ingredients listed • Verify amounts used • Restricted Ingredients • Stored under Lock & Key

  28. Packaging Line Procedures • Save 1 label per Roll (or case); • Verify Big 9; • Corrugate (save 1 box / pallet); • 3 Individuals (min. of 2 mgt.) Verify

  29. Ingredient / Product Spills • Cleaned in a manner as to prevent any cross-contact.

  30. Packaging “Leakers” • Dispose of Properly • Properly clean line.

  31. Allergen Training • Annual Training of all employees • (30 minutes) • Record

  32. Obsolete Labels • Isolated • Destroyed

  33. Hold Requirements • Normal Hold for “Quality” Issues • Category 1 Hold – Food Safety Issues • Pathogen Testing • Allergen Testing • “Daily Inventory” • Electronic (minimum) • Physical (when possible)

  34. If score > 90 in each HACCP Sanitation Quality No Product Recalls or Market Withdrawals AND > 80 in each “Quality” Category: Foreign Material Food Defense Wgt Control Label Verification Thermal Processing Minimizing the Window Ingredient Receiving Internal Audits Conducted by Corporate – “Quality Cup”

  35. Additional Site Specific Actions

  36. High-Speed Packaging Lines • Red & Yellow Hormel® Chili • CNB – Soy & Wheat • CWB – Soy only • 500+ cans / min. • Bar-code reading systems • (See next slides)

  37. SI #

  38. Questions?

More Related