1 / 43

polyin2p3.fr/flc/calice.html

Technical status of the W-Si project CALICE : CA lorimeter for the LI near C ollider with E lectrons. A calorimeter optimized for the Energy Flow measurement of multi-jets final state at the Future Linear Collider running at a center-of-mass energy between 90 GeV to 1 TeV.

fordon
Download Presentation

polyin2p3.fr/flc/calice.html

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technical status of the W-Si project CALICE : CAlorimeter for the LInear Collider with Electrons A calorimeter optimized for the Energy Flow measurement of multi-jets final state at the Future Linear Collider running at a center-of-mass energy between 90 GeV to 1 TeV. Electromagnetic Calorimeter Hadronic Calorimeter http://polywww.in2p3.fr/flc/calice.html

  2. General view of the calorimeter Tracker : TPC ECAL : Sandwich Wplate & Si Wafer HCAL : DHCAL or AHCAL Coil : 4 T (2 )

  3. ECAL concept : • A fine granularity calorimeter with large number of segmentation is proposed as the best solution for the energy flow, lepton identification, photon reconstruction with good precision on energy and direction. • On the other side, the coil thickness is bigger than usual due to the 4 Tesla field needed to maintain the machine background close to the beam pipe. Therefore , the ECAL has to be very compact. (1,30 m for ECAL and HCAL) • Such a calorimeter could be made of Tungsten-Silicon sandwich. • With pad of 1x1 cm and 40 layers : A TRACKER CALORIMETER . • It gives a clean picture of all energy flow objects in all type of events • Simulation using GEANT4 lead to think of an energy resolution on electron/photon in the region of Delta E /E = 11% / sqrt(E)

  4. Toward physique prototype :

  5. Prototypes overview Global view of the test beam setup VME/… ECAL general view HCAL 2nd structure (2×1.4mm of W plates) 3rd structure (3×1.4mm of W plates) 180 mm BEAM ECAL Beam monitoring Movable table VFE 370 mm 1st structure (1.4mm of W plates) 370 mm Detector slab Silicon wafer

  6. Mould for alveolus structure 1.4 Structure 5 alveolus :(10 layers) Detector slab (here it is just a type H structure) Alveolus structures Design and construction of a mould with all metallic pieces for the 3 different structures

  7. Sizes of the structure : Alveolus 374.5 mm 125.6 mm 8.5 mm

  8. Front End electronics Shielding PCB Silicon wafer (Cfi / W) structuretype H Detector slab Transverseview Silicon wafer (0.525 mm) PCB (multi-layers) ( 2.4 mm) Al. Shielding 8.5 mm • PCB : • 14 layers • Thickness 2.4 mm Composite structure(0.15 mm / layer) Tungsten (1.4 mm, 2×1.4 or 3×1.4 mm)

  9. Carbon fiber Tungsten 1.4 mm thick Type H structure Conception and realization of mould for manufacturing the whole 30 typeH structures (3 different thickness W) : Ended alveolar : Mould structure H :

  10. Sizes of the structure : Slab Aluminum foil : ~0.1 mm PCB : 2.4 mm Wafer : 0.525 mm Carbon fiber : 0.15 mm 8,3 mm W plate : 1.4 mm

  11. PCB, Wafer, Chip : still in progress PCB

  12. PCB, Wafer, Chip : still in progress PCB Wafer

  13. PCB, Wafer, Chip : still in progress PCB Chip

  14. ECAL prototype silicon wafer description • 4” high resistivity wafers • 525 microns thick – 5Kcm • tile side: 62.0 + 0.0 • - 0.1 mm • guard ring Dead zone width is only 1mm First test production with 43 wafers 39 good (< 2 nA leakage)

  15. Wafer : Thickness : 525 microns  3 % In silicon ~80 e-h pairs / micron  42000 e- /MiP Capacitance : ~25 pF Leakage current : 1 – 5 nA Full depletion bias : ~150 V Nominal operating bias : 200 V Institute of Nuclear Physics - Moscow State University Institute of Physics, Academy of Sciences of the Czech Republic - Prague Leakage curent (nA)

  16. 2 2 2 2 2 62mm 10mm 6 2 10mm Diode footprint 62mm 1 wafer Diode bias Sig. readout Diode pin out Detector schematic description Amorphous silicon deposition Resistance Capacitance(AC coupling) Yvan Bonnasieux Physique des Interfaces et Couches Minces - Ecole Polytechnique - Palaiseau Aluminium sheet PCB Wafers The aluminium sheet is the ground

  17. Passive component on the wafer : • Capacitance : • Dielectric : silicon nitrite • Refractive index : n=2 • Thickness : e = 2 m C= 1,32 nF • Resistance : • material : aSiH • Resistivity : =1011 .cm • Thickness : l = 2 m R= 102 M

  18. Passive component on the wafer : • Capacitance : C ~ 1.4 nF Leakage current Problemof measurement • Resistance : Still in progress …

  19. Gluing of Si wafer A automatic device is use to deposit the conductive glue : Gluing and placement ( 0.1 mm) of270wafers with 6×6 pads About 10 000 points of glue. X-Y-Z table (400×400×150 mm3) with glue dispensing tool (conductive glue)

  20. Charge preamp Detector shaper Track & hold Vdc = -200V Amp DC block OPA Front end electronic : Asic Laboratoire de l'Accélérateur Linéaire - Orsay

  21. Charge preamp Detector shaper Track & hold Vdc = -200V Amp DC block OPA Front end electronic : Asic Laboratoire de l'Accélérateur Linéaire - Orsay 4.2 pC max input charge (650 MIP) 2.8V dynamic range below 1% non-linearity

  22. Charge preamp Detector shaper Track & hold Vdc = -200V Amp DC block OPA 180nspeaking time Front end electronic : Asic Laboratoire de l'Accélérateur Linéaire - Orsay

  23. Charge preamp Detector shaper Track & hold Vdc = -200V Amp DC block OPA Front end electronic : Asic Laboratoire de l'Accélérateur Linéaire - Orsay Multiplexing output : 18 channel / chip 2 chips / wafer ENC = 2200 @ 80 pF Talk from Bernard Bouquet : R&D for ECAL-VFE technology prototype

  24. Front end electronic : Asic

  25. Linearity simulation New FLC_PHY2 • Peaking time is 200ns on both gain • High-gain shapers can be shut down by switching off their biases • Two different output for low gain and high gain • Interface compatibility with the read out is kept New interface not written at this point Transient simulation

  26. DAQ :VME (use and modify CMS board for Si tracker) Need of 6 boards for physic prototype Talk from Paul Dauncey : DAQ for the CALICE beam test

  27. Cosmic test bench: general view

  28. Cosmic test bench: general view • 2 XY planes : 16 in X et 16 in Y (40x40 cm2) • scintillators reading : PM + Ampli + Trigger Logic • Crate VME : • QDC CAEN • Trigger + Veto (dual timer) • Crate Controller : PCI MXI-2 (NI) board

  29. Cosmic test bench: general view • Pattern generation board (Labo) : • Numerical CPLD • Clock toward PCB : 208 KHz • Level translator TTL/RS422

  30. Cosmic test bench: general view Commercial board (National Instrument) - PCI Interface - ADC 12 bits (1.25 Msa/s) - DMA Transfer - Input dynamic : from +/- 0.05 to +/- 10V Talk from Cristina Lo Bianco : Assembly and cosmic test for the W-SI prototype (CALICE)

  31. Other ECAL R&D • Thermal studies • VFE inside beam(Chip evaluation board and small DAQ are ready) • Passive component on the wafer (Capacitance Ok and resistance still in progress) • Amorphous silicon … (works of Pierre Jarron at Cern) • …

  32. Other ECAL R&D • Thermal studies

  33. Other ECAL R&D • Thermal studies In the case of 40 layers and considering a power dissipated of about 5 mW/cm2 the temperature at the middle of structure would be about 280 °C

  34. Cooling channel Heat points (VFE chip) Thermal sensors Externalconnections PCB 1mm thick(with wafers) Structure type H Radiator aluminium plate Other ECAL R&D • Thermal studies

  35. Other ECAL R&D • Thermal studies • VFE inside beam(Chip evaluation board and small DAQ are ready) • Passive component on the wafer (Capacitance Ok and resistance still in progress) • Amorphous silicon … (works of Pierre Jarron at Cern) • …

  36. Physic prototype : who ? • Mechanic : • W plates : Russian • ECAL Structure : LLR • Infrastructure of beam test : LPC Clermont-ferrand ? and ? • beam Hodoscope : ? • Data processing : • DAQ / Event Builder : ? • Simulation : LLR • Electronic : • VFE : LAL • DAQ : UK • Slow control : ? • Instrumentation : • silicon : LLR and PICM + Russian and Czech • ECAL Integration :LLR • Cosmic test bench : LLR

  37. Physic Prototype : Planning

  38. Physic Prototype : Planning

  39. Physic Prototype : Planning

  40. Physic Prototype : Planning

  41. Physic Prototype : Planning

  42. Physic Prototype : Planning

  43. Conclusion : • Physic prototype  program is well advances • First test beam with electrons mi 2004 • First hadronic test beam  2005 • All is not covered : • Physic prototype in 2004 • R&D (thermal et electronic) • … http://polywww.in2p3.fr/flc/calice.html

More Related