1 / 18

Analysis of Revised Receptor Site Installation Order

Analysis of Revised Receptor Site Installation Order. Jim Valenti COPC Meeting 21 October 2009. Analysis Methodology. Methodology Cases run by adding SafetyNet sites in the proposed install order Multiple DSAT runs executed at each case with weather and station outages DSAT Parameters

fran
Download Presentation

Analysis of Revised Receptor Site Installation Order

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Analysis of Revised Receptor Site Installation Order Jim Valenti COPC Meeting 21 October 2009

  2. Analysis Methodology • Methodology • Cases run by adding SafetyNet sites in the proposed install order • Multiple DSAT runs executed at each case with weather and station outages • DSAT Parameters • Satellites: 1 nominal orbit planes (1330) • Rain: Worst Month Rain Statistics (ITU model) • Margin: 3 db link margin • VIIRS: VIIRS day / night acquisition and compression rates modeled • IDPS: IDPS queuing model. • DMR: Updated DMR processing model

  3. FY09 FY09 FY10 FY10 FY11 FY11 FY12 FY12 FY13 FY13 07/23/10 12/17/10 3572 – Orlando 06/09/09 04/22/10 10/25/10 10/21/11 05/13/11 3574 – Svalbard 7/06/10 12/16/11 07/22/11 1/23/11 11/11/10 McMurdo Multimission Opt.1 12/16/10 02/24/11 1/23/12 11/11/11 Key 35790 – McMurdo Site Prep Period 7/06/10 12/16/11 Site Install Period 02/24/12 Site Integration & C/O System Test (off-site) Site Integration 3/15/12 CY09 CY09 CY10 CY10 CY11 CY11 CY12 CY12 CY13 CY13 C3S Receptors (Phase 1)

  4. FY12 FY12 FY13 FY13 FY14 FY14 FY15 FY15 FY16 FY16 10/24/14 76936 – Chile 76932 – India 76916 – Alaska 76940 – N. Zealand 76912 – Spain 76928 – Arizona 76924 – Hawaii 76912 – Brazil 6/03/13 4/12/13 11/16/12 9/10/12 9/23/13 12/01/11 6/18/12 5/23/14 1/24/14 7/11/14 10/25/13 8/02/13 1/25/13 10/31/14 1/02/14 2/13/15 02/15/13 10/11/13 76908 – Australia 4/07/14 5/15/15 05/03/13 4/17/15 04/11/14 76948– S. Africa 5/05/14 7/24/15 06/26/15 10/12/12 76952 – Guam 8/04/14 9/18/15 07/12/13 Key Site Prep Period 2/14/14 Site Install Period Site Integration & C/O System Test (off-site) 76944 – Japan 07/25/14 4/09/12 5/24/13 CY12 CY12 CY13 CY13 CY14 CY14 CY15 CY15 CY16 CY16 C2 C1 C3S Receptors (Phase 2) 2/13/15 O&S

  5. 95% Latency Based on Revised Receptor Site Installation Order ◄Florida and Svalbard Receptors installed previously C2 Launch - 5/16/2016 ► C1 Launch - 3/14/2014

  6. Svalbard, McMurdo, and Florida95% System Latency Latency (min)

  7. New Zealand Added Latency (min)

  8. Japan Added Latency (min)

  9. Chile Added Latency (min)

  10. Alaska Added Latency (min)

  11. Arizona Added Latency (min)

  12. Spain Added Latency (min)

  13. India Added Latency (min)

  14. Hawaii Added Latency (min)

  15. Brazil Added Latency (min)

  16. Australia Added Latency (min)

  17. South Africa Added Latency (min)

  18. Guam Added Latency (min)

More Related